Project

IDINDIGO-POJ-0168
Impact Bond Name - (Value)Big Picture Learning in Doncaster
Alternative Names - (Value)Big Picture Learning
Stage of Development - (Value)Implementation
Stage of Development - (Source ID's)source1
Dates - Date outcomes contract signed - (Value)2018-10
Dates - Date contracts between all parties signed - (Value)2018-12
Dates - Anticipated completion date - (Value)2024-10
Dates - Start date of service provision - (Value)2019-01
Dates - Anticipated end date of service provision - (Value)2024-08
Dates - (Source ID's)source1
Overall project finance - Total investment commitment - Currency - (Value)GBP
Overall project finance - Total investment commitment - Amount - Exact - (Value)750000
Overall project finance - Total investment commitment - Amount USD - Exact - (Value)982500
Overall project finance - Maximum potential outcome payment - Currency - (Value)GBP
Overall project finance - Maximum potential outcome payment - Amount - (Value)6194792
Overall project finance - Maximum potential outcome payment - Amount USD - (Value)8264885.02120031
Overall project finance - Configuration of the Contracting Parties - (Value)Intermediated contract with payments made through SPV (representatives from investor and provider)
Overall project finance - (Source ID's)source1
Purpose and classifications - Social challenge - (Value)Education and youth disengagement
Purpose and classifications - Intervention - (Value)Big Picture Learning (BPL) is an innovative learning design, working with young people in small advisory groups. It is an alternative provision to Learning Centres and Pupil Referral Units within Doncaster.
Purpose and classifications - Policy sector - (Value)Education
Purpose and classifications - (Source ID's)source1
Service and beneficiaries - Target population - (Value)Doncaster children and young people aged 11-16 who are disengaged from education. They work with those showing early signs of crisis and provide them with a stable and supportive learning environment that works with them as individuals.
Service and beneficiaries - Targeted number of unique service users or beneficiaries (total) - (Value)220
Service and beneficiaries - Unit type of targeted service users or beneficiaries - (Value)Individual
Service and beneficiaries - (Source ID's)source1
Changes to project due to COVID-19 - (Value)Pause project
Changes to project due to COVID-19 - (Source ID's)source1
Outcome Funds 1: IdINDIGO-FUND-0012
Delivery Locations 1: Service Provision ID - (Value)deliverylocation1
Delivery Locations 1: Location - Name - (Value)Doncaster Metropolitan Borough Council
Delivery Locations 1: Location - Postcode - (Value)DN1 3BU
Delivery Locations 1: Location - Country - (Value)GB
Delivery Locations 1: Lat/Lng - Lat - (Value)53.52282
Delivery Locations 1: Lat/Lng - Lng - (Value)-1.128462
Sources 1: Idsource1
Sources 1: Name - (Value)DCMS Data Portal for the Life Chances Fund
Sources 1: Type - (Value)Website
Sources 1: Publishing Organisations - (Value)Department for Digital, Culture, Media and Sports
Sources 1: Internal URL - (Value)https://lcf.lightning.force.com/lightning/r/Form_LCF_Grant_Baseline_1__c/a0d1n00000P3qqrAAB/view
Sources 1: Publication Date - (Value)2020-07-01
Sources 1: Accessed Date - (Value)2020-08-08
Sources 2: Idsourcehackandlearn2021
Sources 2: Name - (Value)Hack and Learn - March 2021
Sources 3: Idsource2
Sources 3: Name - (Value)UK Contracts Finder – OCDS
Sources 3: Type - (Value)Website
Sources 3: URL - (Value)https://www.contractsfinder.service.gov.uk/Published/notice/releases/1fa312e9-98a7-4faa-bda0-cae401c2032b.json
Sources 3: Accessed Date - (Value)2023-03-14
Sources 4: Idsource3
Sources 4: Name - (Value)UK Contracts Finder – Website
Sources 4: Type - (Value)Website
Sources 4: URL - (Value)https://www.contractsfinder.service.gov.uk/notice/1fa312e9-98a7-4faa-bda0-cae401c2032b?origin=SearchResults&p=1
Sources 4: Accessed Date - (Value)2023-03-14
Sources 5: Idsource4
Sources 5: Name - (Value)Email communication with project lead.
Sources 5: Accessed Date - (Value)2023-12-11
Service Provisions 1: IdBig Picture Learning Lancaster
Service Provisions 1: Organisation ID - (Value)INDIGO-ORG-1063
Service Provisions 1: Intervention - (Value)Big Picture Learning (BPL). This is an innovative learning design, working with young people in small advisory groups. It is an alternative provision to Learning Centres and Pupil Referral Units within Doncaster.
Service Provisions 1: Planned Service - Start - (Value)2019-01-01
Service Provisions 1: Planned Service - End - (Value)2024-08-31
Service Provisions 1: Actual Service - Start - (Value)2019-01-01
Outcome Payment Commitments 1: Organisation ID - (Value)INDIGO-ORG-0171
Outcome Payment Commitments 1: Organisation Role Category - (Value)Government/Public Sector/Public Bank
Outcome Payment Commitments 1: Maximum potential Outcome payment - Currency - (Value)GBP
Outcome Payment Commitments 1: Maximum potential Outcome payment - Amount - (Value)1795810
Outcome Payment Commitments 2: Organisation ID - (Value)INDIGO-ORG-1062
Outcome Payment Commitments 2: Organisation Role Category - (Value)Government/Public Sector/Public Bank
Outcome Payment Commitments 2: Maximum potential Outcome payment - Currency - (Value)GBP
Outcome Payment Commitments 2: Maximum potential Outcome payment - Amount - (Value)4398982
Investments 1: Idinvestment1
Investments 1: Organisation ID - (Value)INDIGO-ORG-0008
Investments 1: Investment Commitment - Currency - (Value)GBP
Investments 1: Investment Commitment - Amount - Exact - (Value)750000
Investments 1: Investment Commitment - Amount USD - Exact - (Value)982500
Outcome Metrics 1: Idoutcomemetric1
Outcome Metrics 1: Outcome Definition - (Value)Key Stage 3, Metric 1: High Quality Personal Learning Plan established within 4 weeks of student beginning attendance.
Outcome Metrics 1: Targeted number of service users Or beneficiaries (total) - (Value)32
Outcome Metrics 1: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 1: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 1: Policy sector - (Value)Education
Outcome Metrics 1: Primary SDG goal - (Value)4
Outcome Metrics 1: Primary SDG target - (Value)4.1
Outcome Metrics 2: Idoutcomemetric2
Outcome Metrics 2: Outcome Definition - (Value)Key Stage 3, Metric 2: Attendance – students will achieve an 80% attendance outcome against the Attendance target set out in their Personal Learning Plan.
Outcome Metrics 2: Targeted number of service users Or beneficiaries (total) - (Value)329
Outcome Metrics 2: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 2: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 2: Policy sector - (Value)Education
Outcome Metrics 2: Primary SDG goal - (Value)4
Outcome Metrics 2: Primary SDG target - (Value)4.1
Outcome Metrics 3: Idoutcomemetric3
Outcome Metrics 3: Outcome Definition - (Value)Key Stage 3, Metric 3: Progress – Verification of PLP will demonstrate a consistent standard of planning and impact and will support an overall evaluation of ‘good’ progress.
Outcome Metrics 3: Targeted number of service users Or beneficiaries (total) - (Value)103
Outcome Metrics 3: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 3: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 3: Policy sector - (Value)Education
Outcome Metrics 3: Primary SDG goal - (Value)4
Outcome Metrics 3: Primary SDG target - (Value)4.1
Outcome Metrics 4: Idoutcomemetric4
Outcome Metrics 4: Outcome Definition - (Value)Key Stage 3, Metric 4: Reintegration – Review of PLP on completion of programme which will include support to the school and how learning can be continued in a mainstream setting.
Outcome Metrics 4: Targeted number of service users Or beneficiaries (total) - (Value)2
Outcome Metrics 4: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 4: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 4: Policy sector - (Value)Education
Outcome Metrics 4: Primary SDG goal - (Value)4
Outcome Metrics 4: Primary SDG target - (Value)4.1
Outcome Metrics 5: Idoutcomemetric5
Outcome Metrics 5: Outcome Definition - (Value)Key Stage 4, Metric 1: Personal Learning Plan established.
Outcome Metrics 5: Targeted number of service users Or beneficiaries (total) - (Value)65
Outcome Metrics 5: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 5: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 5: Policy sector - (Value)Education
Outcome Metrics 5: Primary SDG goal - (Value)4
Outcome Metrics 5: Primary SDG target - (Value)4.1
Outcome Metrics 6: Idoutcomemetric6
Outcome Metrics 6: Outcome Definition - (Value)Key Stage 4, Metric 2: Attendance.
Outcome Metrics 6: Targeted number of service users Or beneficiaries (total) - (Value)122
Outcome Metrics 6: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 6: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 6: Policy sector - (Value)Education
Outcome Metrics 6: Primary SDG goal - (Value)4
Outcome Metrics 6: Primary SDG target - (Value)4.1
Outcome Metrics 7: Idoutcomemetric7
Outcome Metrics 7: Outcome Definition - (Value)Key Stage 4, Metric 3: Engagement with Workplace.
Outcome Metrics 7: Targeted number of service users Or beneficiaries (total) - (Value)168
Outcome Metrics 7: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 7: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 7: Policy sector - (Value)Education
Outcome Metrics 7: Primary SDG goal - (Value)4
Outcome Metrics 7: Primary SDG target - (Value)4.1
Outcome Metrics 8: Idoutcomemetric8
Outcome Metrics 8: Outcome Definition - (Value)Key Stage 4, Metric 4: Workplace Skills.
Outcome Metrics 8: Targeted number of service users Or beneficiaries (total) - (Value)166
Outcome Metrics 8: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 8: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 8: Policy sector - (Value)Education
Outcome Metrics 8: Primary SDG goal - (Value)4
Outcome Metrics 8: Primary SDG target - (Value)4.1
Outcome Metrics 9: Idoutcomemetric9
Outcome Metrics 9: Outcome Definition - (Value)Key Stage 4, Metric 5: Accredited Qualifications.
Outcome Metrics 9: Targeted number of service users Or beneficiaries (total) - (Value)174
Outcome Metrics 9: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 9: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 9: Policy sector - (Value)Education
Outcome Metrics 9: Primary SDG goal - (Value)4
Outcome Metrics 9: Primary SDG target - (Value)4.1
Outcome Metrics 10: Idoutcomemetric10
Outcome Metrics 10: Outcome Definition - (Value)Key Stage 4, Metric 6: Personal Learning Plan Refresh.
Outcome Metrics 10: Targeted number of service users Or beneficiaries (total) - (Value)15
Outcome Metrics 10: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 10: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 10: Policy sector - (Value)Education
Outcome Metrics 10: Primary SDG goal - (Value)4
Outcome Metrics 10: Primary SDG target - (Value)4.1
Results 1: Outcome Metric Id - (Value)outcomemetric1
Results 1: Result level - (Value)Outcome level
Results 1: Result type - (Value)Interim
Results 1: Period - Start - (Value)2021-03
Results 1: Period - End - (Value)2024-03
Results 1: Outcomes achieved - (Value)32
Results 2: Outcome Metric Id - (Value)outcomemetric2
Results 2: Result level - (Value)Outcome level
Results 2: Result type - (Value)Interim
Results 2: Period - Start - (Value)2021-03
Results 2: Period - End - (Value)2024-03
Results 2: Outcomes achieved - (Value)315
Results 3: Outcome Metric Id - (Value)outcomemetric3
Results 3: Result level - (Value)Outcome level
Results 3: Result type - (Value)Interim
Results 3: Period - Start - (Value)2021-03
Results 3: Period - End - (Value)2024-03
Results 3: Outcomes achieved - (Value)229
Results 4: Outcome Metric Id - (Value)outcomemetric4
Results 4: Result level - (Value)Outcome level
Results 4: Result type - (Value)Interim
Results 4: Period - Start - (Value)2023-04
Results 4: Period - End - (Value)2024-03
Results 4: Outcomes achieved - (Value)21
Results 5: Outcome Metric Id - (Value)outcomemetric5
Results 5: Result level - (Value)Outcome level
Results 5: Result type - (Value)Interim
Results 5: Period - Start - (Value)2021-07
Results 5: Period - End - (Value)2024-03
Results 5: Outcomes achieved - (Value)88
Results 6: Outcome Metric Id - (Value)outcomemetric6
Results 6: Result level - (Value)Outcome level
Results 6: Result type - (Value)Interim
Results 6: Period - Start - (Value)2022-04
Results 6: Period - End - (Value)2024-03
Results 6: Outcomes achieved - (Value)140
Results 7: Outcome Metric Id - (Value)outcomemetric7
Results 7: Result level - (Value)Outcome level
Results 7: Result type - (Value)Interim
Results 7: Period - Start - (Value)2021-10
Results 7: Period - End - (Value)2024-03
Results 7: Outcomes achieved - (Value)126
Results 8: Outcome Metric Id - (Value)outcomemetric8
Results 8: Result level - (Value)Outcome level
Results 8: Result type - (Value)Interim
Results 8: Period - Start - (Value)2021-10
Results 8: Period - End - (Value)2024-03
Results 8: Outcomes achieved - (Value)182
Results 9: Outcome Metric Id - (Value)outcomemetric9
Results 9: Result level - (Value)Outcome level
Results 9: Result type - (Value)Interim
Results 9: Period - Start - (Value)2021-10
Results 9: Period - End - (Value)2024-03
Results 9: Outcomes achieved - (Value)195
Results 10: Outcome Metric Id - (Value)outcomemetric10
Results 10: Result level - (Value)Outcome level
Results 10: Result type - (Value)Interim
Results 10: Period - Start - (Value)2022-04
Results 10: Period - End - (Value)2024-03
Results 10: Outcomes achieved - (Value)21
Open Contracting data 1: OCIDocds-b5fd17-732e0b99-a389-4f58-a800-dbb6a2bbda95
Documents 1: Title - (Value)Doncaster’s Alternative Provision Evaluation - Final Report
Documents 1: URL - (Value)https://golab.bsg.ox.ac.uk/documents/Doncaster_Alternative_Provision_Final_Report__002.pdf
Outcome Payment Plans 1: Outcome Payment Plan Id - (Value)plan1
Outcome Payment Plans 1: Period - Start - (Value)2019-03
Outcome Payment Plans 1: Period - End - (Value)2021-03
Outcome Payment Plans 2: Outcome Payment Plan Id - (Value)plan2
Outcome Payment Plans 2: Period - Start - (Value)2021-03
Outcome Payment Plans 2: Period - End - (Value)2023-03
Outcome Payment Plans 3: Outcome Payment Plan Id - (Value)plan3
Outcome Payment Plans 3: Period - Start - (Value)2023-03
Outcome Payment Plans 3: Period - End - (Value)2024-01
Outcome Payment Plans 4: Outcome Payment Plan Id - (Value)plan4
Outcome Payment Plans 4: Period - Start - (Value)2024-01
Outcome Payment Plans 4: Period - End - (Value)current
Outcome Payments 1: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 1: Period - Start - (Value)2019-01
Outcome Payments 1: Period - End - (Value)2019-03
Outcome Payments 1: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 1: Type - (Value)Planned
Outcome Payments 1: Payments - Currency - (Value)GBP
Outcome Payments 1: Payments - Amount - (Value)183011
Outcome Payments 2: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 2: Period - Start - (Value)2019-04
Outcome Payments 2: Period - End - (Value)2019-06
Outcome Payments 2: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 2: Type - (Value)Planned
Outcome Payments 2: Payments - Currency - (Value)GBP
Outcome Payments 2: Payments - Amount - (Value)226103
Outcome Payments 3: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 3: Period - Start - (Value)2019-07
Outcome Payments 3: Period - End - (Value)2019-09
Outcome Payments 3: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 3: Type - (Value)Planned
Outcome Payments 3: Payments - Currency - (Value)GBP
Outcome Payments 3: Payments - Amount - (Value)428384
Outcome Payments 4: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 4: Period - Start - (Value)2019-10
Outcome Payments 4: Period - End - (Value)2019-12
Outcome Payments 4: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 4: Type - (Value)Planned
Outcome Payments 4: Payments - Currency - (Value)GBP
Outcome Payments 5: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 5: Period - Start - (Value)2020-01
Outcome Payments 5: Period - End - (Value)2020-03
Outcome Payments 5: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 5: Type - (Value)Planned
Outcome Payments 5: Payments - Currency - (Value)GBP
Outcome Payments 5: Payments - Amount - (Value)258372
Outcome Payments 6: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 6: Period - Start - (Value)2020-04
Outcome Payments 6: Period - End - (Value)2020-06
Outcome Payments 6: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 6: Type - (Value)Planned
Outcome Payments 6: Payments - Currency - (Value)GBP
Outcome Payments 6: Payments - Amount - (Value)346732
Outcome Payments 7: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 7: Period - Start - (Value)2020-07
Outcome Payments 7: Period - End - (Value)2020-09
Outcome Payments 7: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 7: Type - (Value)Planned
Outcome Payments 7: Payments - Currency - (Value)GBP
Outcome Payments 7: Payments - Amount - (Value)278360
Outcome Payments 8: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 8: Period - Start - (Value)2020-10
Outcome Payments 8: Period - End - (Value)2020-12
Outcome Payments 8: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 8: Type - (Value)Planned
Outcome Payments 8: Payments - Currency - (Value)GBP
Outcome Payments 8: Payments - Amount - (Value)366080
Outcome Payments 9: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 9: Period - Start - (Value)2021-01
Outcome Payments 9: Period - End - (Value)2021-03
Outcome Payments 9: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 9: Type - (Value)Planned
Outcome Payments 9: Payments - Currency - (Value)GBP
Outcome Payments 9: Payments - Amount - (Value)269665
Outcome Payments 10: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 10: Period - Start - (Value)2021-04
Outcome Payments 10: Period - End - (Value)2021-06
Outcome Payments 10: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 10: Type - (Value)Planned
Outcome Payments 10: Payments - Currency - (Value)GBP
Outcome Payments 10: Payments - Amount - (Value)268131
Outcome Payments 11: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 11: Period - Start - (Value)2021-07
Outcome Payments 11: Period - End - (Value)2021-09
Outcome Payments 11: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 11: Type - (Value)Planned
Outcome Payments 11: Payments - Currency - (Value)GBP
Outcome Payments 11: Payments - Amount - (Value)184426
Outcome Payments 12: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 12: Period - Start - (Value)2021-10
Outcome Payments 12: Period - End - (Value)2021-12
Outcome Payments 12: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 12: Type - (Value)Planned
Outcome Payments 12: Payments - Currency - (Value)GBP
Outcome Payments 12: Payments - Amount - (Value)328540
Outcome Payments 13: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 13: Period - Start - (Value)2022-01
Outcome Payments 13: Period - End - (Value)2022-03
Outcome Payments 13: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 13: Type - (Value)Planned
Outcome Payments 13: Payments - Currency - (Value)GBP
Outcome Payments 13: Payments - Amount - (Value)306488
Outcome Payments 14: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 14: Period - Start - (Value)2022-04
Outcome Payments 14: Period - End - (Value)2022-06
Outcome Payments 14: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 14: Type - (Value)Planned
Outcome Payments 14: Payments - Currency - (Value)GBP
Outcome Payments 14: Payments - Amount - (Value)298357
Outcome Payments 15: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 15: Period - Start - (Value)2022-07
Outcome Payments 15: Period - End - (Value)2022-09
Outcome Payments 15: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 15: Type - (Value)Planned
Outcome Payments 15: Payments - Currency - (Value)GBP
Outcome Payments 15: Payments - Amount - (Value)195272
Outcome Payments 16: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 16: Period - Start - (Value)2022-10
Outcome Payments 16: Period - End - (Value)2022-12
Outcome Payments 16: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 16: Type - (Value)Planned
Outcome Payments 16: Payments - Currency - (Value)GBP
Outcome Payments 16: Payments - Amount - (Value)345579
Outcome Payments 17: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 17: Period - Start - (Value)2023-01
Outcome Payments 17: Period - End - (Value)2023-03
Outcome Payments 17: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 17: Type - (Value)Planned
Outcome Payments 17: Payments - Currency - (Value)GBP
Outcome Payments 17: Payments - Amount - (Value)322010
Outcome Payments 18: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 18: Period - Start - (Value)2023-04
Outcome Payments 18: Period - End - (Value)2023-06
Outcome Payments 18: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 18: Type - (Value)Planned
Outcome Payments 18: Payments - Currency - (Value)GBP
Outcome Payments 18: Payments - Amount - (Value)310769
Outcome Payments 19: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 19: Period - Start - (Value)2023-07
Outcome Payments 19: Period - End - (Value)2023-09
Outcome Payments 19: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 19: Type - (Value)Planned
Outcome Payments 19: Payments - Currency - (Value)GBP
Outcome Payments 19: Payments - Amount - (Value)195272
Outcome Payments 20: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 20: Period - Start - (Value)2023-10
Outcome Payments 20: Period - End - (Value)2023-12
Outcome Payments 20: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 20: Type - (Value)Planned
Outcome Payments 20: Payments - Currency - (Value)GBP
Outcome Payments 20: Payments - Amount - (Value)352187
Outcome Payments 21: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 21: Period - Start - (Value)2024-01
Outcome Payments 21: Period - End - (Value)2024-03
Outcome Payments 21: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 21: Type - (Value)Planned
Outcome Payments 21: Payments - Currency - (Value)GBP
Outcome Payments 21: Payments - Amount - (Value)326240
Outcome Payments 22: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 22: Period - Start - (Value)2024-04
Outcome Payments 22: Period - End - (Value)2024-06
Outcome Payments 22: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 22: Type - (Value)Planned
Outcome Payments 22: Payments - Currency - (Value)GBP
Outcome Payments 22: Payments - Amount - (Value)265683
Outcome Payments 23: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 23: Period - Start - (Value)2024-07
Outcome Payments 23: Period - End - (Value)2024-09
Outcome Payments 23: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 23: Type - (Value)Planned
Outcome Payments 23: Payments - Currency - (Value)GBP
Outcome Payments 23: Payments - Amount - (Value)302787
Outcome Payments 24: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 24: Period - Start - (Value)2024-10
Outcome Payments 24: Period - End - (Value)2024-12
Outcome Payments 24: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 24: Type - (Value)Planned
Outcome Payments 24: Payments - Currency - (Value)GBP
Outcome Payments 24: Payments - Amount - (Value)27536
Outcome Payments 25: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 25: Period - Start - (Value)2019-04
Outcome Payments 25: Period - End - (Value)2019-06
Outcome Payments 25: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 25: Type - (Value)Planned
Outcome Payments 25: Payments - Currency - (Value)GBP
Outcome Payments 25: Payments - Amount - (Value)114305
Outcome Payments 26: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 26: Period - Start - (Value)2019-07
Outcome Payments 26: Period - End - (Value)2019-09
Outcome Payments 26: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 26: Type - (Value)Planned
Outcome Payments 26: Payments - Currency - (Value)GBP
Outcome Payments 26: Payments - Amount - (Value)134304
Outcome Payments 27: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 27: Period - Start - (Value)2019-10
Outcome Payments 27: Period - End - (Value)2019-12
Outcome Payments 27: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 27: Type - (Value)Planned
Outcome Payments 27: Payments - Currency - (Value)GBP
Outcome Payments 28: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 28: Period - Start - (Value)2020-01
Outcome Payments 28: Period - End - (Value)2020-03
Outcome Payments 28: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 28: Type - (Value)Planned
Outcome Payments 28: Payments - Currency - (Value)GBP
Outcome Payments 28: Payments - Amount - (Value)170455
Outcome Payments 29: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 29: Period - Start - (Value)2020-04
Outcome Payments 29: Period - End - (Value)2020-06
Outcome Payments 29: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 29: Type - (Value)Planned
Outcome Payments 29: Payments - Currency - (Value)GBP
Outcome Payments 30: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 30: Period - Start - (Value)2020-07
Outcome Payments 30: Period - End - (Value)2020-09
Outcome Payments 30: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 30: Type - (Value)Planned
Outcome Payments 30: Payments - Currency - (Value)GBP
Outcome Payments 30: Payments - Amount - (Value)111697
Outcome Payments 31: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 31: Period - Start - (Value)2020-10
Outcome Payments 31: Period - End - (Value)2020-12
Outcome Payments 31: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 31: Type - (Value)Planned
Outcome Payments 31: Payments - Currency - (Value)GBP
Outcome Payments 31: Payments - Amount - (Value)10331
Outcome Payments 32: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 32: Period - Start - (Value)2021-01
Outcome Payments 32: Period - End - (Value)2021-03
Outcome Payments 32: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 32: Type - (Value)Planned
Outcome Payments 32: Payments - Currency - (Value)GBP
Outcome Payments 32: Payments - Amount - (Value)269143
Outcome Payments 33: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 33: Period - Start - (Value)2021-04
Outcome Payments 33: Period - End - (Value)2021-06
Outcome Payments 33: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 33: Type - (Value)Planned
Outcome Payments 33: Payments - Currency - (Value)GBP
Outcome Payments 33: Payments - Amount - (Value)414413
Outcome Payments 34: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 34: Period - Start - (Value)2021-07
Outcome Payments 34: Period - End - (Value)2021-09
Outcome Payments 34: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 34: Type - (Value)Planned
Outcome Payments 34: Payments - Currency - (Value)GBP
Outcome Payments 34: Payments - Amount - (Value)819576
Outcome Payments 35: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 35: Period - Start - (Value)2021-10
Outcome Payments 35: Period - End - (Value)2021-12
Outcome Payments 35: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 35: Type - (Value)Planned
Outcome Payments 35: Payments - Currency - (Value)GBP
Outcome Payments 35: Payments - Amount - (Value)207567
Outcome Payments 36: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 36: Period - Start - (Value)2022-01
Outcome Payments 36: Period - End - (Value)2022-03
Outcome Payments 36: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 36: Type - (Value)Planned
Outcome Payments 36: Payments - Currency - (Value)GBP
Outcome Payments 36: Payments - Amount - (Value)414559
Outcome Payments 37: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 37: Period - Start - (Value)2022-04
Outcome Payments 37: Period - End - (Value)2022-06
Outcome Payments 37: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 37: Type - (Value)Planned
Outcome Payments 37: Payments - Currency - (Value)GBP
Outcome Payments 37: Payments - Amount - (Value)196547
Outcome Payments 38: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 38: Period - Start - (Value)2022-07
Outcome Payments 38: Period - End - (Value)2022-09
Outcome Payments 38: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 38: Type - (Value)Planned
Outcome Payments 38: Payments - Currency - (Value)GBP
Outcome Payments 38: Payments - Amount - (Value)573683
Outcome Payments 39: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 39: Period - Start - (Value)2022-10
Outcome Payments 39: Period - End - (Value)2022-12
Outcome Payments 39: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 39: Type - (Value)Planned
Outcome Payments 39: Payments - Currency - (Value)GBP
Outcome Payments 39: Payments - Amount - (Value)458033
Outcome Payments 40: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 40: Period - Start - (Value)2023-01
Outcome Payments 40: Period - End - (Value)2023-03
Outcome Payments 40: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 40: Type - (Value)Planned
Outcome Payments 40: Payments - Currency - (Value)GBP
Outcome Payments 40: Payments - Amount - (Value)551048
Outcome Payments 41: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 41: Period - Start - (Value)2023-04
Outcome Payments 41: Period - End - (Value)2023-06
Outcome Payments 41: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 41: Type - (Value)Planned
Outcome Payments 41: Payments - Currency - (Value)GBP
Outcome Payments 41: Payments - Amount - (Value)196547
Outcome Payments 42: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 42: Period - Start - (Value)2023-07
Outcome Payments 42: Period - End - (Value)2023-09
Outcome Payments 42: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 42: Type - (Value)Planned
Outcome Payments 42: Payments - Currency - (Value)GBP
Outcome Payments 42: Payments - Amount - (Value)428652
Outcome Payments 43: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 43: Period - Start - (Value)2023-10
Outcome Payments 43: Period - End - (Value)2023-12
Outcome Payments 43: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 43: Type - (Value)Planned
Outcome Payments 43: Payments - Currency - (Value)GBP
Outcome Payments 43: Payments - Amount - (Value)351552
Outcome Payments 44: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 44: Period - Start - (Value)2024-01
Outcome Payments 44: Period - End - (Value)2024-03
Outcome Payments 44: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 44: Type - (Value)Planned
Outcome Payments 44: Payments - Currency - (Value)GBP
Outcome Payments 44: Payments - Amount - (Value)577866
Outcome Payments 45: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 45: Period - Start - (Value)2024-04
Outcome Payments 45: Period - End - (Value)2024-06
Outcome Payments 45: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 45: Type - (Value)Planned
Outcome Payments 45: Payments - Currency - (Value)GBP
Outcome Payments 45: Payments - Amount - (Value)196547
Outcome Payments 46: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 46: Period - Start - (Value)2024-07
Outcome Payments 46: Period - End - (Value)2024-09
Outcome Payments 46: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 46: Type - (Value)Planned
Outcome Payments 46: Payments - Currency - (Value)GBP
Outcome Payments 46: Payments - Amount - (Value)407750
Outcome Payments 47: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 47: Period - Start - (Value)2024-10
Outcome Payments 47: Period - End - (Value)2024-12
Outcome Payments 47: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 47: Type - (Value)Planned
Outcome Payments 47: Payments - Currency - (Value)GBP
Outcome Payments 47: Payments - Amount - (Value)1496298
Outcome Payments 48: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 48: Period - Start - (Value)2025-01
Outcome Payments 48: Period - End - (Value)2025-03
Outcome Payments 48: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 48: Type - (Value)Planned
Outcome Payments 48: Payments - Currency - (Value)GBP
Outcome Payments 49: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 49: Period - Start - (Value)2019-04
Outcome Payments 49: Period - End - (Value)2019-06
Outcome Payments 49: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 49: Type - (Value)Planned
Outcome Payments 49: Payments - Currency - (Value)GBP
Outcome Payments 49: Payments - Amount - (Value)89135
Outcome Payments 50: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 50: Period - Start - (Value)2019-07
Outcome Payments 50: Period - End - (Value)2019-09
Outcome Payments 50: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 50: Type - (Value)Planned
Outcome Payments 50: Payments - Currency - (Value)GBP
Outcome Payments 50: Payments - Amount - (Value)104730
Outcome Payments 51: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 51: Period - Start - (Value)2019-10
Outcome Payments 51: Period - End - (Value)2019-12
Outcome Payments 51: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 51: Type - (Value)Planned
Outcome Payments 51: Payments - Currency - (Value)GBP
Outcome Payments 51: Payments - Amount - (Value)132960
Outcome Payments 52: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 52: Period - Start - (Value)2020-01
Outcome Payments 52: Period - End - (Value)2020-03
Outcome Payments 52: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 52: Type - (Value)Planned
Outcome Payments 52: Payments - Currency - (Value)GBP
Outcome Payments 52: Payments - Amount - (Value)87100
Outcome Payments 53: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 53: Period - Start - (Value)2020-04
Outcome Payments 53: Period - End - (Value)2020-06
Outcome Payments 53: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 53: Type - (Value)Planned
Outcome Payments 53: Payments - Currency - (Value)GBP
Outcome Payments 54: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 54: Period - Start - (Value)2020-07
Outcome Payments 54: Period - End - (Value)2020-09
Outcome Payments 54: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 54: Type - (Value)Planned
Outcome Payments 54: Payments - Currency - (Value)GBP
Outcome Payments 54: Payments - Amount - (Value)8040
Outcome Payments 55: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 55: Period - Start - (Value)2020-10
Outcome Payments 55: Period - End - (Value)2020-12
Outcome Payments 55: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 55: Type - (Value)Planned
Outcome Payments 55: Payments - Currency - (Value)GBP
Outcome Payments 55: Payments - Amount - (Value)209450
Outcome Payments 56: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 56: Period - Start - (Value)2021-01
Outcome Payments 56: Period - End - (Value)2021-03
Outcome Payments 56: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 56: Type - (Value)Planned
Outcome Payments 56: Payments - Currency - (Value)GBP
Outcome Payments 56: Payments - Amount - (Value)159730
Outcome Payments 57: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 57: Period - Start - (Value)2021-04
Outcome Payments 57: Period - End - (Value)2021-06
Outcome Payments 57: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 57: Type - (Value)Planned
Outcome Payments 57: Payments - Currency - (Value)GBP
Outcome Payments 57: Payments - Amount - (Value)94090
Outcome Payments 58: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 58: Period - Start - (Value)2021-07
Outcome Payments 58: Period - End - (Value)2021-09
Outcome Payments 58: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 58: Type - (Value)Planned
Outcome Payments 58: Payments - Currency - (Value)GBP
Outcome Payments 58: Payments - Amount - (Value)147820
Outcome Payments 59: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 59: Period - Start - (Value)2021-10
Outcome Payments 59: Period - End - (Value)2021-12
Outcome Payments 59: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 59: Type - (Value)Planned
Outcome Payments 59: Payments - Currency - (Value)GBP
Outcome Payments 59: Payments - Amount - (Value)242379
Outcome Payments 60: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 60: Period - Start - (Value)2022-01
Outcome Payments 60: Period - End - (Value)2022-03
Outcome Payments 60: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 60: Type - (Value)Planned
Outcome Payments 60: Payments - Currency - (Value)GBP
Outcome Payments 60: Payments - Amount - (Value)150600
Outcome Payments 61: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 61: Period - Start - (Value)2022-04
Outcome Payments 61: Period - End - (Value)2022-06
Outcome Payments 61: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 61: Type - (Value)Planned
Outcome Payments 61: Payments - Currency - (Value)GBP
Outcome Payments 61: Payments - Amount - (Value)150699
Outcome Payments 62: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 62: Period - Start - (Value)2022-07
Outcome Payments 62: Period - End - (Value)2022-09
Outcome Payments 62: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 62: Type - (Value)Planned
Outcome Payments 62: Payments - Currency - (Value)GBP
Outcome Payments 62: Payments - Amount - (Value)89450
Outcome Payments 63: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 63: Period - Start - (Value)2022-10
Outcome Payments 63: Period - End - (Value)2022-12
Outcome Payments 63: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 63: Type - (Value)Planned
Outcome Payments 63: Payments - Currency - (Value)GBP
Outcome Payments 63: Payments - Amount - (Value)6408
Outcome Payments 64: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 64: Period - Start - (Value)2023-01
Outcome Payments 64: Period - End - (Value)2023-03
Outcome Payments 64: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 64: Type - (Value)Planned
Outcome Payments 64: Payments - Currency - (Value)GBP
Outcome Payments 64: Payments - Amount - (Value)439424
Outcome Payments 65: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 65: Period - Start - (Value)2023-04
Outcome Payments 65: Period - End - (Value)2023-06
Outcome Payments 65: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 65: Type - (Value)Planned
Outcome Payments 65: Payments - Currency - (Value)GBP
Outcome Payments 65: Payments - Amount - (Value)279245
Outcome Payments 66: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 66: Period - Start - (Value)2023-07
Outcome Payments 66: Period - End - (Value)2023-09
Outcome Payments 66: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 66: Type - (Value)Planned
Outcome Payments 66: Payments - Currency - (Value)GBP
Outcome Payments 66: Payments - Amount - (Value)340260
Outcome Payments 67: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 67: Period - Start - (Value)2023-10
Outcome Payments 67: Period - End - (Value)2023-12
Outcome Payments 67: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 67: Type - (Value)Planned
Outcome Payments 67: Payments - Currency - (Value)GBP
Outcome Payments 67: Payments - Amount - (Value)286820
Outcome Payments 68: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 68: Period - Start - (Value)2024-01
Outcome Payments 68: Period - End - (Value)2024-03
Outcome Payments 68: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 68: Type - (Value)Planned
Outcome Payments 68: Payments - Currency - (Value)GBP
Outcome Payments 68: Payments - Amount - (Value)381680
Outcome Payments 69: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 69: Period - Start - (Value)2024-04
Outcome Payments 69: Period - End - (Value)2024-06
Outcome Payments 69: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 69: Type - (Value)Planned
Outcome Payments 69: Payments - Currency - (Value)GBP
Outcome Payments 69: Payments - Amount - (Value)366100
Outcome Payments 70: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 70: Period - Start - (Value)2024-07
Outcome Payments 70: Period - End - (Value)2024-09
Outcome Payments 70: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 70: Type - (Value)Planned
Outcome Payments 70: Payments - Currency - (Value)GBP
Outcome Payments 70: Payments - Amount - (Value)349120
Outcome Payments 71: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 71: Period - Start - (Value)2024-10
Outcome Payments 71: Period - End - (Value)2024-12
Outcome Payments 71: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 71: Type - (Value)Planned
Outcome Payments 71: Payments - Currency - (Value)GBP
Outcome Payments 71: Payments - Amount - (Value)295680
Outcome Payments 72: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 72: Period - Start - (Value)2025-01
Outcome Payments 72: Period - End - (Value)2025-03
Outcome Payments 72: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 72: Type - (Value)Planned
Outcome Payments 72: Payments - Currency - (Value)GBP
Outcome Payments 72: Payments - Amount - (Value)232560
Outcome Payments 73: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 73: Period - Start - (Value)2019-04
Outcome Payments 73: Period - End - (Value)2019-06
Outcome Payments 73: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 73: Type - (Value)Planned
Outcome Payments 73: Payments - Currency - (Value)GBP
Outcome Payments 73: Payments - Amount - (Value)89135
Outcome Payments 74: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 74: Period - Start - (Value)2019-07
Outcome Payments 74: Period - End - (Value)2019-09
Outcome Payments 74: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 74: Type - (Value)Planned
Outcome Payments 74: Payments - Currency - (Value)GBP
Outcome Payments 74: Payments - Amount - (Value)104730
Outcome Payments 75: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 75: Period - Start - (Value)2019-10
Outcome Payments 75: Period - End - (Value)2019-12
Outcome Payments 75: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 75: Type - (Value)Planned
Outcome Payments 75: Payments - Currency - (Value)GBP
Outcome Payments 75: Payments - Amount - (Value)132960
Outcome Payments 76: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 76: Period - Start - (Value)2020-01
Outcome Payments 76: Period - End - (Value)2020-03
Outcome Payments 76: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 76: Type - (Value)Planned
Outcome Payments 76: Payments - Currency - (Value)GBP
Outcome Payments 76: Payments - Amount - (Value)87100
Outcome Payments 77: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 77: Period - Start - (Value)2020-04
Outcome Payments 77: Period - End - (Value)2020-06
Outcome Payments 77: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 77: Type - (Value)Planned
Outcome Payments 77: Payments - Currency - (Value)GBP
Outcome Payments 78: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 78: Period - Start - (Value)2020-07
Outcome Payments 78: Period - End - (Value)2020-09
Outcome Payments 78: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 78: Type - (Value)Planned
Outcome Payments 78: Payments - Currency - (Value)GBP
Outcome Payments 78: Payments - Amount - (Value)8040
Outcome Payments 79: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 79: Period - Start - (Value)2020-10
Outcome Payments 79: Period - End - (Value)2020-12
Outcome Payments 79: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 79: Type - (Value)Planned
Outcome Payments 79: Payments - Currency - (Value)GBP
Outcome Payments 79: Payments - Amount - (Value)209450
Outcome Payments 80: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 80: Period - Start - (Value)2021-01
Outcome Payments 80: Period - End - (Value)2021-03
Outcome Payments 80: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 80: Type - (Value)Planned
Outcome Payments 80: Payments - Currency - (Value)GBP
Outcome Payments 80: Payments - Amount - (Value)253820
Outcome Payments 81: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 81: Period - Start - (Value)2021-04
Outcome Payments 81: Period - End - (Value)2021-06
Outcome Payments 81: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 81: Type - (Value)Planned
Outcome Payments 81: Payments - Currency - (Value)GBP
Outcome Payments 81: Payments - Amount - (Value)147820
Outcome Payments 82: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 82: Period - Start - (Value)2021-07
Outcome Payments 82: Period - End - (Value)2021-09
Outcome Payments 82: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 82: Type - (Value)Planned
Outcome Payments 82: Payments - Currency - (Value)GBP
Outcome Payments 82: Payments - Amount - (Value)242379
Outcome Payments 83: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 83: Period - Start - (Value)2021-10
Outcome Payments 83: Period - End - (Value)2021-12
Outcome Payments 83: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 83: Type - (Value)Planned
Outcome Payments 83: Payments - Currency - (Value)GBP
Outcome Payments 83: Payments - Amount - (Value)150600
Outcome Payments 84: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 84: Period - Start - (Value)2022-01
Outcome Payments 84: Period - End - (Value)2022-03
Outcome Payments 84: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 84: Type - (Value)Planned
Outcome Payments 84: Payments - Currency - (Value)GBP
Outcome Payments 84: Payments - Amount - (Value)150699
Outcome Payments 85: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 85: Period - Start - (Value)2022-04
Outcome Payments 85: Period - End - (Value)2022-06
Outcome Payments 85: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 85: Type - (Value)Planned
Outcome Payments 85: Payments - Currency - (Value)GBP
Outcome Payments 85: Payments - Amount - (Value)89450
Outcome Payments 86: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 86: Period - Start - (Value)2022-07
Outcome Payments 86: Period - End - (Value)2022-09
Outcome Payments 86: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 86: Type - (Value)Planned
Outcome Payments 86: Payments - Currency - (Value)GBP
Outcome Payments 86: Payments - Amount - (Value)6408
Outcome Payments 87: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 87: Period - Start - (Value)2022-10
Outcome Payments 87: Period - End - (Value)2022-12
Outcome Payments 87: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 87: Type - (Value)Planned
Outcome Payments 87: Payments - Currency - (Value)GBP
Outcome Payments 87: Payments - Amount - (Value)439424
Outcome Payments 88: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 88: Period - Start - (Value)2023-01
Outcome Payments 88: Period - End - (Value)2023-03
Outcome Payments 88: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 88: Type - (Value)Planned
Outcome Payments 88: Payments - Currency - (Value)GBP
Outcome Payments 88: Payments - Amount - (Value)279245
Outcome Payments 89: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 89: Period - Start - (Value)2023-04
Outcome Payments 89: Period - End - (Value)2023-06
Outcome Payments 89: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 89: Type - (Value)Planned
Outcome Payments 89: Payments - Currency - (Value)GBP
Outcome Payments 89: Payments - Amount - (Value)214394
Outcome Payments 90: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 90: Period - Start - (Value)2023-07
Outcome Payments 90: Period - End - (Value)2023-09
Outcome Payments 90: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 90: Type - (Value)Planned
Outcome Payments 90: Payments - Currency - (Value)GBP
Outcome Payments 91: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 91: Period - Start - (Value)2023-10
Outcome Payments 91: Period - End - (Value)2023-12
Outcome Payments 91: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 91: Type - (Value)Planned
Outcome Payments 91: Payments - Currency - (Value)GBP
Outcome Payments 91: Payments - Amount - (Value)568239
Outcome Payments 92: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 92: Period - Start - (Value)2024-01
Outcome Payments 92: Period - End - (Value)2024-03
Outcome Payments 92: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 92: Type - (Value)Planned
Outcome Payments 92: Payments - Currency - (Value)GBP
Outcome Payments 92: Payments - Amount - (Value)513276
Outcome Payments 93: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 93: Period - Start - (Value)2024-04
Outcome Payments 93: Period - End - (Value)2024-06
Outcome Payments 93: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 93: Type - (Value)Planned
Outcome Payments 93: Payments - Currency - (Value)GBP
Outcome Payments 93: Payments - Amount - (Value)557163
Outcome Payments 94: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 94: Period - Start - (Value)2024-07
Outcome Payments 94: Period - End - (Value)2024-09
Outcome Payments 94: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 94: Type - (Value)Planned
Outcome Payments 94: Payments - Currency - (Value)GBP
Outcome Payments 95: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 95: Period - Start - (Value)2024-10
Outcome Payments 95: Period - End - (Value)2024-12
Outcome Payments 95: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 95: Type - (Value)Planned
Outcome Payments 95: Payments - Currency - (Value)GBP
Outcome Payments 95: Payments - Amount - (Value)1318914
Outcome Payments 96: Period - Start - (Value)2019-01
Outcome Payments 96: Period - End - (Value)2019-03
Outcome Payments 96: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 96: Type - (Value)Actual
Outcome Payments 96: Payments - Currency - (Value)GBP
Outcome Payments 96: Payments - Amount - (Value)89135
Outcome Payments 97: Period - Start - (Value)2019-04
Outcome Payments 97: Period - End - (Value)2019-06
Outcome Payments 97: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 97: Type - (Value)Actual
Outcome Payments 97: Payments - Currency - (Value)GBP
Outcome Payments 97: Payments - Amount - (Value)104730
Outcome Payments 98: Period - Start - (Value)2019-07
Outcome Payments 98: Period - End - (Value)2019-09
Outcome Payments 98: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 98: Type - (Value)Actual
Outcome Payments 98: Payments - Currency - (Value)GBP
Outcome Payments 98: Payments - Amount - (Value)132960
Outcome Payments 99: Period - Start - (Value)2019-10
Outcome Payments 99: Period - End - (Value)2020-02
Outcome Payments 99: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 99: Type - (Value)Actual
Outcome Payments 99: Payments - Currency - (Value)GBP
Outcome Payments 99: Payments - Amount - (Value)87100
Outcome Payments 100: Period - Start - (Value)2020-07
Outcome Payments 100: Period - End - (Value)2020-09
Outcome Payments 100: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 100: Type - (Value)Actual
Outcome Payments 100: Payments - Currency - (Value)GBP
Outcome Payments 100: Payments - Amount - (Value)8040
Outcome Payments 101: Period - Start - (Value)2020-10
Outcome Payments 101: Period - End - (Value)2020-12
Outcome Payments 101: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 101: Type - (Value)Actual
Outcome Payments 101: Payments - Currency - (Value)GBP
Outcome Payments 101: Payments - Amount - (Value)209450
Outcome Payments 102: Period - Start - (Value)2021-01
Outcome Payments 102: Period - End - (Value)2021-02
Outcome Payments 102: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 102: Type - (Value)Actual
Outcome Payments 102: Payments - Currency - (Value)GBP
Outcome Payments 102: Payments - Amount - (Value)159730
Outcome Payments 103: Period - Start - (Value)2021-03
Outcome Payments 103: Period - End - (Value)2021-03
Outcome Payments 103: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 103: Type - (Value)Actual
Outcome Payments 103: Payments - Currency - (Value)GBP
Outcome Payments 103: Payments - Amount - (Value)94090
Outcome Payments 104: Period - Start - (Value)2021-04
Outcome Payments 104: Period - End - (Value)2021-06
Outcome Payments 104: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 104: Type - (Value)Actual
Outcome Payments 104: Payments - Currency - (Value)GBP
Outcome Payments 104: Payments - Amount - (Value)147820
Outcome Payments 105: Period - Start - (Value)2021-07
Outcome Payments 105: Period - End - (Value)2021-09
Outcome Payments 105: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 105: Type - (Value)Actual
Outcome Payments 105: Payments - Currency - (Value)GBP
Outcome Payments 105: Payments - Amount - (Value)242379
Outcome Payments 106: Period - Start - (Value)2021-10
Outcome Payments 106: Period - End - (Value)2021-12
Outcome Payments 106: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 106: Type - (Value)Actual
Outcome Payments 106: Payments - Currency - (Value)GBP
Outcome Payments 106: Payments - Amount - (Value)150600
Outcome Payments 107: Period - Start - (Value)2022-01
Outcome Payments 107: Period - End - (Value)2022-03
Outcome Payments 107: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 107: Type - (Value)Actual
Outcome Payments 107: Payments - Currency - (Value)GBP
Outcome Payments 107: Payments - Amount - (Value)150699
Outcome Payments 108: Period - Start - (Value)2022-01
Outcome Payments 108: Period - End - (Value)2022-03
Outcome Payments 108: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 108: Type - (Value)Actual
Outcome Payments 108: Payments - Currency - (Value)GBP
Outcome Payments 108: Payments - Amount - (Value)89450
Outcome Payments 109: Period - Start - (Value)2022-01
Outcome Payments 109: Period - End - (Value)2022-03
Outcome Payments 109: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 109: Type - (Value)Actual
Outcome Payments 109: Payments - Currency - (Value)GBP
Outcome Payments 109: Payments - Amount - (Value)6408
Outcome Payments 110: Period - Start - (Value)2022-04
Outcome Payments 110: Period - End - (Value)2022-07
Outcome Payments 110: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 110: Type - (Value)Actual
Outcome Payments 110: Payments - Currency - (Value)GBP
Outcome Payments 110: Payments - Amount - (Value)439424
Outcome Payments 111: Period - Start - (Value)2022-09
Outcome Payments 111: Period - End - (Value)2022-12
Outcome Payments 111: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 111: Type - (Value)Actual
Outcome Payments 111: Payments - Currency - (Value)GBP
Outcome Payments 111: Payments - Amount - (Value)279245
Outcome Payments 112: Period - Start - (Value)2023-01
Outcome Payments 112: Period - End - (Value)2023-03
Outcome Payments 112: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 112: Type - (Value)Actual
Outcome Payments 112: Payments - Currency - (Value)GBP
Outcome Payments 112: Payments - Amount - (Value)214394
Outcome Payments 113: Period - Start - (Value)2023-04
Outcome Payments 113: Period - End - (Value)2023-07
Outcome Payments 113: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 113: Type - (Value)Actual
Outcome Payments 113: Payments - Currency - (Value)GBP
Outcome Payments 113: Payments - Amount - (Value)568239
Outcome Payments 114: Period - Start - (Value)2023-09
Outcome Payments 114: Period - End - (Value)2023-12
Outcome Payments 114: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 114: Type - (Value)Actual
Outcome Payments 114: Payments - Currency - (Value)GBP
Outcome Payments 114: Payments - Amount - (Value)341138
Outcome Payments 115: Period - Start - (Value)2023-09
Outcome Payments 115: Period - End - (Value)2023-12
Outcome Payments 115: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 115: Type - (Value)Actual
Outcome Payments 115: Payments - Currency - (Value)GBP
Outcome Payments 115: Payments - Amount - (Value)175971
Outcome Payments 116: Period - Start - (Value)2024-01
Outcome Payments 116: Period - End - (Value)2024-01
Outcome Payments 116: Payer Organisation ID - (Value)INDIGO-ORG-0171,INDIGO-ORG-1062
Outcome Payments 116: Type - (Value)Actual
Outcome Payments 116: Payments - Currency - (Value)GBP
Outcome Payments 116: Payments - Amount - (Value)492697