Impact Bond Name - (Value)Pyramid Project - Step down from Residential Care Provision
Alternative Names - (Value)Pyramid Project
Stage of Development - (Value)Complete
Stage of Development - (Source ID's)source1
Social Investment Prototype - (Value)YES
Dates - Date outcomes contract signed - (Value)2020-06
Dates - Date contracts between all parties signed - (Value)2020-07
Dates - Anticipated completion date - (Value)2026-01
Dates - Actual completion date - (Value)2024-09
Dates - Start date of service provision - (Value)2020-04
Dates - Anticipated end date of service provision - (Value)2026-01
Dates - (Source ID's)source1
Dates - (Notes) The Pyramid Project was originally designed to deliver services until January 2026 but ended in September 2024.
Overall project finance - Total investment commitment - Currency - (Value)GBP
Overall project finance - Total investment commitment - Amount - Exact - (Value)925562
Overall project finance - Total investment commitment - Amount USD - Exact - (Value)1148347.07
Overall project finance - Maximum potential outcome payment - Currency - (Value)GBP
Overall project finance - Maximum potential outcome payment - Amount - (Value)11341260
Overall project finance - Configuration of the Contracting Parties - (Value)Intermediated contract with payments made through SPV (investor backed)
Overall project finance - (Source ID's)source1
Purpose and classifications - Intervention - (Value)Therapeutic step down foster care
Purpose and classifications - Policy sector - (Value)Child and family welfare
Purpose and classifications - (Source ID's)source1
Service and beneficiaries - Target population - (Value)Looked after children
Service and beneficiaries - Targeted number of unique service users or beneficiaries (total) - (Value)92
Service and beneficiaries - Unit type of targeted service users or beneficiaries - (Value)Individual
Service and beneficiaries - Actual number of unique service users or beneficiaries engaged (total) - (Value)16
Service and beneficiaries - Unit type of actual service users or beneficiaries engaged - (Value)Individual
Service and beneficiaries - (Source ID's)source1
Changes to project due to COVID-19 - (Value)Continue on outcomes contract without variations
Changes to project due to COVID-19 - (Source ID's)source1
Outcome Funds 1: IdINDIGO-FUND-0012
Delivery Locations 1: Service Provision ID - (Value)deliverylocation1
Delivery Locations 1: Location - Name - (Value)Telford & Wrekin Council
Delivery Locations 1: Location - Postcode - (Value)TF3 4EJ
Delivery Locations 1: Location - Country - (Value)GB
Delivery Locations 1: Lat/Lng - Lat - (Value)52.768555
Delivery Locations 1: Lat/Lng - Lng - (Value)-2.375587
Delivery Locations 2: Service Provision ID - (Value)deliverylocation2
Delivery Locations 2: Location - Name - (Value)Worcestershire County Council
Delivery Locations 2: Location - Postcode - (Value)WR5 2NP
Delivery Locations 2: Location - Country - (Value)GB
Delivery Locations 2: Lat/Lng - Lat - (Value)52.192001
Delivery Locations 2: Lat/Lng - Lng - (Value)-2.22
Delivery Locations 3: Service Provision ID - (Value)deliverylocation3
Delivery Locations 3: Location - Name - (Value)City of Wolverhampton Council
Delivery Locations 3: Location - Postcode - (Value)WV1 1SH
Delivery Locations 3: Location - Country - (Value)GB
Delivery Locations 3: Lat/Lng - Lat - (Value)52.59137
Delivery Locations 3: Lat/Lng - Lng - (Value)-2.110748
Delivery Locations 4: Service Provision ID - (Value)deliverylocation4
Delivery Locations 4: Location - Name - (Value)Staffordshire County Council
Delivery Locations 4: Location - Postcode - (Value)ST16 2DH
Delivery Locations 4: Location - Country - (Value)GB
Delivery Locations 4: Lat/Lng - Lat - (Value)52.679935
Delivery Locations 4: Lat/Lng - Lng - (Value)-1.921781
Delivery Locations 5: Service Provision ID - (Value)deliverylocation5
Delivery Locations 5: Location - Name - (Value)Dudley Council
Delivery Locations 5: Location - Postcode - (Value)DY1 1HF
Delivery Locations 5: Location - Country - (Value)GB
Delivery Locations 5: Lat/Lng - Lat - (Value)52.5
Delivery Locations 5: Lat/Lng - Lng - (Value)-2.08333
Sources 1: Idsource1
Sources 1: Name - (Value)DCMS Data Portal for LCF Projects
Sources 1: Type - (Value)Website
Sources 1: Publishing Organisations - (Value)INDIGO-ORG-0171, INDIGO-ORG-0306
Sources 1: Internal URL - (Value)https://lcf.lightning.force.com/lightning/r/Form_LCF_Grant_Baseline_1__c/a0d4J000003JRt6QAG/view
Service Provisions 1: Idserviceprovision1
Service Provisions 1: Organisation ID - (Value)INDIGO-ORG-1156
Service Provisions 1: Organisation Role Category - (Value)For-profit
Service Provisions 1: Intervention - (Value)Therapeutic step down foster care
Service Provisions 1: Planned Service - Start - (Value)2020-04
Service Provisions 1: Planned Service - End - (Value)2026-01
Service Provisions 1: Actual Service - Start - (Value)2020-04
Outcome Payment Commitments 1: Organisation ID - (Value)INDIGO-ORG-1157
Outcome Payment Commitments 1: Organisation Role Category - (Value)Government/Public Sector/Public Bank
Outcome Payment Commitments 1: Maximum potential Outcome payment - Currency - (Value)GBP
Outcome Payment Commitments 1: Maximum potential Outcome payment - Amount - (Value)1572155
Outcome Payment Commitments 2: Organisation ID - (Value)INDIGO-ORG-0318
Outcome Payment Commitments 2: Organisation Role Category - (Value)Government/Public Sector/Public Bank
Outcome Payment Commitments 2: Maximum potential Outcome payment - Currency - (Value)GBP
Outcome Payment Commitments 2: Maximum potential Outcome payment - Amount - (Value)2620258
Outcome Payment Commitments 3: Organisation ID - (Value)INDIGO-ORG-1158
Outcome Payment Commitments 3: Organisation Role Category - (Value)Government/Public Sector/Public Bank
Outcome Payment Commitments 3: Maximum potential Outcome payment - Currency - (Value)GBP
Outcome Payment Commitments 3: Maximum potential Outcome payment - Amount - (Value)2620258
Outcome Payment Commitments 4: Organisation ID - (Value)INDIGO-ORG-0808
Outcome Payment Commitments 4: Organisation Role Category - (Value)Government/Public Sector/Public Bank
Outcome Payment Commitments 4: Maximum potential Outcome payment - Currency - (Value)GBP
Outcome Payment Commitments 4: Maximum potential Outcome payment - Amount - (Value)3144310
Outcome Payment Commitments 5: Organisation ID - (Value)INDIGO-ORG-1159
Outcome Payment Commitments 5: Organisation Role Category - (Value)Government/Public Sector/Public Bank
Outcome Payment Commitments 5: Maximum potential Outcome payment - Currency - (Value)GBP
Outcome Payment Commitments 5: Maximum potential Outcome payment - Amount - (Value)2096207
Outcome Payment Commitments 6: Organisation ID - (Value)INDIGO-ORG-0171
Outcome Payment Commitments 6: Organisation Role Category - (Value)Government/Public Sector/Public Bank
Outcome Payment Commitments 6: Maximum potential Outcome payment - Currency - (Value)GBP
Outcome Payment Commitments 6: Maximum potential Outcome payment - Amount - (Value)2388592
Investments 1: Idinvestment1
Investments 1: Organisation ID - (Value)INDIGO-ORG-0008
Investments 1: Organisation Role Category - (Value)Impact Investor
Investments 1: Investment Commitment - Currency - (Value)GBP
Investments 1: Investment Commitment - Amount - Exact - (Value)925562
Intermediary services 1: Organisation ID - (Value)INDIGO-ORG-1078
Intermediary services 1: Organisation Role Category - (Value)Other
Intermediary services 1: Other Role Description - (Value)Complex commissioning and social investment
Intermediary services 2: Organisation ID - (Value)INDIGO-ORG-1160
Intermediary services 2: Organisation Role Category - (Value)Other
Intermediary services 2: Other Role Description - (Value)Complex commissioning and social investment
Outcome Metrics 1: Idoutcomemetric1
Outcome Metrics 1: Outcome Definition - (Value)Metric 1: Child/young person moves from residential care - paid at the end of the first week in placement. 
Outcome Metrics 1: Targeted number of service users Or beneficiaries (total) - (Value)79
Outcome Metrics 1: Unit type of targeted Service users or beneficiaries - (Value)Individual
Outcome Metrics 1: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 1: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 1: Policy sector - (Value)Child and family welfare
Outcome Metrics 1: Primary SDG goal - (Value)1
Outcome Metrics 1: Primary SDG target - (Value)1.3
Outcome Metrics 2: Idoutcomemetric2
Outcome Metrics 2: Outcome Definition - (Value)Metric 2: Continuation of placement - paid per week for a maximum of 104 weeks (West Midlands commissioners)
Outcome Metrics 2: Targeted number of service users Or beneficiaries (total) - (Value)79
Outcome Metrics 2: Unit type of targeted Service users or beneficiaries - (Value)Individual
Outcome Metrics 2: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 2: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 2: Policy sector - (Value)Child and family welfare
Outcome Metrics 2: Primary SDG goal - (Value)1
Outcome Metrics 2: Primary SDG target - (Value)1.3
Outcome Metrics 3: Idoutcomemetric3
Outcome Metrics 3: Outcome Definition - (Value)Metric 3: 6 months sustainment of placement (West Midlands commissioners)
Outcome Metrics 3: Targeted number of service users Or beneficiaries (total) - (Value)79
Outcome Metrics 3: Unit type of targeted Service users or beneficiaries - (Value)Individual
Outcome Metrics 3: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 3: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 3: Policy sector - (Value)Child and family welfare
Outcome Metrics 3: Primary SDG goal - (Value)1
Outcome Metrics 3: Primary SDG target - (Value)1.3
Outcome Metrics 4: Idoutcomemetric4
Outcome Metrics 4: Outcome Definition - (Value)Metric 4: Sustainment of placement – paid at 9, 12, 15, 18, 21, and 24 months (West Midlands commissioners)
Outcome Metrics 4: Targeted number of service users Or beneficiaries (total) - (Value)79
Outcome Metrics 4: Unit type of targeted Service users or beneficiaries - (Value)Individual
Outcome Metrics 4: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 4: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 4: Policy sector - (Value)Child and family welfare
Outcome Metrics 4: Primary SDG goal - (Value)1
Outcome Metrics 4: Primary SDG target - (Value)1.3
Outcome Metrics 5: Idoutcomemetric5
Outcome Metrics 5: Outcome Definition - (Value)Metric 5: Continuation of placement - paid per week for 104 weeks (Surrey commissioners)
Outcome Metrics 5: Targeted number of service users Or beneficiaries (total) - (Value)79
Outcome Metrics 5: Unit type of targeted Service users or beneficiaries - (Value)Individual
Outcome Metrics 5: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 5: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 5: Policy sector - (Value)Child and family welfare
Outcome Metrics 5: Primary SDG goal - (Value)1
Outcome Metrics 5: Primary SDG target - (Value)1.3
Outcome Metrics 6: Idoutcomemetric6
Outcome Metrics 6: Outcome Definition - (Value)Metric 6: Continued sustainment of placement - paid at 3, 6, 9, 12, 15, 18, 21, and 24 months (Surrey commissioners)
Outcome Metrics 6: Targeted number of service users Or beneficiaries (total) - (Value)79
Outcome Metrics 6: Unit type of targeted Service users or beneficiaries - (Value)Individual
Outcome Metrics 6: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 6: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 6: Policy sector - (Value)Child and family welfare
Outcome Metrics 6: Primary SDG goal - (Value)1
Outcome Metrics 6: Primary SDG target - (Value)1.3
Outcome Metrics 7: Idoutcomemetric7
Outcome Metrics 7: Outcome Definition - (Value)Metric 7: Young person aged 16 or over move from residential care complete - paid at the end of the first week in placement. 
Outcome Metrics 7: Targeted number of service users Or beneficiaries (total) - (Value)79
Outcome Metrics 7: Unit type of targeted Service users or beneficiaries - (Value)Individual
Outcome Metrics 7: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 7: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 7: Policy sector - (Value)Child and family welfare
Outcome Metrics 7: Primary SDG goal - (Value)1
Outcome Metrics 7: Primary SDG target - (Value)1.3
Outcome Metrics 8: Idoutcomemetric8
Outcome Metrics 8: Outcome Definition - (Value)Metric 8: Sustainment of placement – paid per week for 13 weeks (young person aged 16 or over)
Outcome Metrics 8: Targeted number of service users Or beneficiaries (total) - (Value)79
Outcome Metrics 8: Unit type of targeted Service users or beneficiaries - (Value)Individual
Outcome Metrics 8: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 8: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 8: Policy sector - (Value)Child and family welfare
Outcome Metrics 8: Primary SDG goal - (Value)1
Outcome Metrics 8: Primary SDG target - (Value)1.3
Outcome Metrics 9: Idoutcomemetric9
Outcome Metrics 9: Outcome Definition - (Value)Metric 9: Sustainment of placement – paid per week, for 14-65 weeks (young person aged 16 or over)
Outcome Metrics 9: Targeted number of service users Or beneficiaries (total) - (Value)79
Outcome Metrics 9: Unit type of targeted Service users or beneficiaries - (Value)Individual
Outcome Metrics 9: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 9: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 9: Policy sector - (Value)Child and family welfare
Outcome Metrics 9: Primary SDG goal - (Value)1
Outcome Metrics 9: Primary SDG target - (Value)1.3
Outcome Metrics 10: Idoutcomemetric10
Outcome Metrics 10: Outcome Definition - (Value)Metric 10: Sustainment of placement for 13 weeks (young person aged 16 or over)
Outcome Metrics 10: Targeted number of service users Or beneficiaries (total) - (Value)79
Outcome Metrics 10: Unit type of targeted Service users or beneficiaries - (Value)Individual
Outcome Metrics 10: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 10: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 10: Policy sector - (Value)Child and family welfare
Outcome Metrics 10: Primary SDG goal - (Value)1
Outcome Metrics 10: Primary SDG target - (Value)1.3
Outcome Metrics 11: Idoutcomemetric11
Outcome Metrics 11: Outcome Definition - (Value)metric 11: Continued sustainment of placement at 3, 6, 9, 12, and 15 months (young person aged 16 or over)
Outcome Metrics 11: Targeted number of service users Or beneficiaries (total) - (Value)79
Outcome Metrics 11: Unit type of targeted Service users or beneficiaries - (Value)Individual
Outcome Metrics 11: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 11: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 11: Policy sector - (Value)Child and family welfare
Outcome Metrics 11: Primary SDG goal - (Value)1
Outcome Metrics 11: Primary SDG target - (Value)1.3
Outcome Metrics 12: Idoutcomemetric12
Outcome Metrics 12: Outcome Definition - (Value)Metric 12: Continuation of placement - paid per week for a maximum of 104 weeks - young person aged 16 or over (West Midlands commissioners)
Outcome Metrics 12: Targeted number of service users Or beneficiaries (total) - (Value)79
Outcome Metrics 12: Unit type of targeted Service users or beneficiaries - (Value)Individual
Outcome Metrics 12: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 12: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 12: Policy sector - (Value)Child and family welfare
Outcome Metrics 12: Primary SDG goal - (Value)1
Outcome Metrics 12: Primary SDG target - (Value)1.3
Outcome Metrics 13: Idoutcomemetric13
Outcome Metrics 13: Outcome Definition - (Value)Metric 13: Continuation of placement - paid per week for a maximum of 104 weeks - young person aged 16 or over (Surrey commissioners)
Outcome Metrics 13: Targeted number of service users Or beneficiaries (total) - (Value)79
Outcome Metrics 13: Unit type of targeted Service users or beneficiaries - (Value)Individual
Outcome Metrics 13: Outcome validation Method - (Value)Simple Ex-post verification
Outcome Metrics 13: Data source for Outcome validation - (Value)New data collected
Outcome Metrics 13: Policy sector - (Value)Child and family welfare
Outcome Metrics 13: Primary SDG goal - (Value)1
Outcome Metrics 13: Primary SDG target - (Value)1.3
Transactions 1: Investment Id - (Value)investment1
Transactions 1: Date - (Value)2020-09
Transactions 1: Sending Organisation ID - (Value)INDIGO-ORG-0008
Transactions 1: Receiving Organisation ID - (Value)INDIGO-ORG-1156
Transactions 1: Transaction Type - (Value)Debt
Transactions 1: Money - Currency - (Value)GBP
Transactions 1: Money - Amount - (Value)200000
Transactions 1: Money - Amount USD - (Value)257260
Transactions 1: NotesThe investment from BII into the Pyramid project is through an SPV: Big Fostering Partnership
Technical Assistance 1: Idtechnicalassistance1
Technical Assistance 1: Title - (Value)Big Issue Invest
Technical Assistance 1: Description - (Value)At risk of investment not completing / Pro-Bono
Technical Assistance 1: Period Start - (Value)2019-05
Technical Assistance 1: Period End - (Value)2020-08
Technical Assistance 1: Funding Organisation Id - (Value)INDIGO-ORG-0008
Technical Assistance 1: Recipient Organisation Id - (Value)INDIGO-ORG-1156
Technical Assistance 1: Currency - (Value)GBP
Technical Assistance Details 1: Technical Assistance Id - (Value)technicalassistance1
Technical Assistance Details 1: Title - (Value)Pre Contract Assistance
Technical Assistance Details 1: Description - (Value)Technical assistance developing the Theory of Change and Impact Strategy
Technical Assistance Details 1: Category - (Value)Theory of Change and Impact Strategy - Support to develop the Theory of Change and Impact Strategy
Technical Assistance Details 1: Approach - (Value)Specific Expertise (One-to-One or Groups)
Technical Assistance Details 1: Cost Type - (Value)Staff cost
Technical Assistance Details 1: Cost of Activities - Amount - (Value)1800.9375
Technical Assistance Details 1: Cost of Activities - Amount USD - (Value)2359.228125
Technical Assistance Details 1: Number of Days - (Value)3.1875
Technical Assistance Details 1: NotesDay rate charged at £565
Technical Assistance Details 2: Technical Assistance Id - (Value)technicalassistance1
Technical Assistance Details 2: Title - (Value)Pre Contract Assistance
Technical Assistance Details 2: Description - (Value)Technical assistance developing an Impact Measurement System
Technical Assistance Details 2: Category - (Value)Theory of Change and Impact Strategy - Support to develop an evaluation framework and performance measures
Technical Assistance Details 2: Approach - (Value)Coaching and mentoring
Technical Assistance Details 2: Cost Type - (Value)Staff cost
Technical Assistance Details 2: Cost of Activities - Amount - (Value)918.125
Technical Assistance Details 2: Cost of Activities - Amount USD - (Value)1202.74375
Technical Assistance Details 2: Number of Days - (Value)1.625
Technical Assistance Details 2: NotesDay rate charged at £565
Technical Assistance Details 3: Technical Assistance Id - (Value)technicalassistance1
Technical Assistance Details 3: Title - (Value)Pre Contract Assistance
Technical Assistance Details 3: Description - (Value)Technical assistance with revenue strategy
Technical Assistance Details 3: Category - (Value)Revenue Strategy - Business Planning
Technical Assistance Details 3: Approach - (Value)Specific Expertise (One-to-One or Groups)
Technical Assistance Details 3: Cost Type - (Value)Staff cost
Technical Assistance Details 3: Cost of Activities - Amount - (Value)10805.625
Technical Assistance Details 3: Cost of Activities - Amount USD - (Value)14155.36875
Technical Assistance Details 3: Number of Days - (Value)19.125
Technical Assistance Details 3: NotesDay rate charged at £565
Technical Assistance Details 4: Technical Assistance Id - (Value)technicalassistance1
Technical Assistance Details 4: Title - (Value)Pre Contract Assistance
Technical Assistance Details 4: Description - (Value)Technical assistance with financial management
Technical Assistance Details 4: Category - (Value)Financial Management - Sound Financial Management Capabilities or Financial Management Tools
Technical Assistance Details 4: Approach - (Value)Mentoring
Technical Assistance Details 4: Cost Type - (Value)Staff cost
Technical Assistance Details 4: Cost of Activities - Amount - (Value)1836.25
Technical Assistance Details 4: Cost of Activities - Amount USD - (Value)2405.4875
Technical Assistance Details 4: Number of Days - (Value)3.25
Technical Assistance Details 4: NotesDay rate charged at £565
Technical Assistance Details 5: Technical Assistance Id - (Value)technicalassistance1
Technical Assistance Details 5: Title - (Value)Pre Contract Assistance
Technical Assistance Details 5: Description - (Value)Technical assistance with governance support
Technical Assistance Details 5: Category - (Value)Governance Support - Board Development or Governance Assistance
Technical Assistance Details 5: Approach - (Value)Specific Expertise (One-to-One or Groups)
Technical Assistance Details 5: Cost Type - (Value)Staff cost
Technical Assistance Details 5: Cost of Activities - Amount - (Value)918.125
Technical Assistance Details 5: Cost of Activities - Amount USD - (Value)1202.74375
Technical Assistance Details 5: Number of Days - (Value)1.625
Technical Assistance Details 5: NotesDay rate charged at £565
Technical Assistance Details 6: Technical Assistance Id - (Value)technicalassistance1
Technical Assistance Details 6: Title - (Value)Pre Contract Assistance
Technical Assistance Details 6: Description - (Value)Technical assistance with strategic support
Technical Assistance Details 6: Category - (Value)Strategic Support - General Management Advice
Technical Assistance Details 6: Approach - (Value)Specific Expertise (One-to-One or Groups)
Technical Assistance Details 6: Cost Type - (Value)Staff cost
Technical Assistance Details 6: Cost of Activities - Amount - (Value)1836.25
Technical Assistance Details 6: Cost of Activities - Amount USD - (Value)2405.4875
Technical Assistance Details 6: Number of Days - (Value)3.25
Technical Assistance Details 6: NotesDay rate charged at £565
Results 1: Outcome Metric Id - (Value)outcomemetric1
Results 1: Result level - (Value)Outcome level
Results 1: Result type - (Value)Final
Results 1: Period - Start - (Value)2020-07
Results 1: Period - End - (Value)2024-09
Results 1: Outcomes achieved - (Value)16
Results 2: Outcome Metric Id - (Value)outcomemetric2
Results 2: Result level - (Value)Outcome level
Results 2: Result type - (Value)Final
Results 2: Period - Start - (Value)2020-07
Results 2: Period - End - (Value)2024-09
Results 2: Outcomes achieved - (Value)6
Results 3: Outcome Metric Id - (Value)outcomemetric3
Results 3: Result level - (Value)Outcome level
Results 3: Result type - (Value)Final
Results 3: Period - Start - (Value)2020-07
Results 3: Period - End - (Value)2024-09
Results 3: Outcomes achieved - (Value)8
Results 4: Outcome Metric Id - (Value)outcomemetric4
Results 4: Result level - (Value)Outcome level
Results 4: Result type - (Value)Final
Results 4: Period - Start - (Value)2020-07
Results 4: Period - End - (Value)2024-09
Results 4: Outcomes achieved - (Value)6
Results 5: Outcome Metric Id - (Value)outcomemetric5
Results 5: Result level - (Value)Outcome level
Results 5: Result type - (Value)Final
Results 5: Period - Start - (Value)2020-07
Results 5: Period - End - (Value)2024-09
Results 6: Outcome Metric Id - (Value)outcomemetric6
Results 6: Result level - (Value)Outcome level
Results 6: Result type - (Value)Final
Results 6: Period - Start - (Value)2020-07
Results 6: Period - End - (Value)2024-09
Results 7: Outcome Metric Id - (Value)outcomemetric7
Results 7: Result level - (Value)Outcome level
Results 7: Result type - (Value)Final
Results 7: Period - Start - (Value)2020-07
Results 7: Period - End - (Value)2024-09
Results 7: Outcomes achieved - (Value)1
Results 8: Outcome Metric Id - (Value)outcomemetric8
Results 8: Result level - (Value)Outcome level
Results 8: Result type - (Value)Final
Results 8: Period - Start - (Value)2020-07
Results 8: Period - End - (Value)2024-09
Results 8: Outcomes achieved - (Value)1
Results 9: Outcome Metric Id - (Value)outcomemetric9
Results 9: Result level - (Value)Outcome level
Results 9: Result type - (Value)Final
Results 9: Period - Start - (Value)2020-07
Results 9: Period - End - (Value)2024-09
Results 9: Outcomes achieved - (Value)1
Results 10: Outcome Metric Id - (Value)outcomemetric10
Results 10: Result level - (Value)Outcome level
Results 10: Result type - (Value)Final
Results 10: Period - Start - (Value)2020-07
Results 10: Period - End - (Value)2024-09
Results 10: Outcomes achieved - (Value)1
Results 11: Outcome Metric Id - (Value)outcomemetric11
Results 11: Result level - (Value)Outcome level
Results 11: Result type - (Value)Final
Results 11: Period - Start - (Value)2020-07
Results 11: Period - End - (Value)2024-09
Results 11: Outcomes achieved - (Value)1
Results 12: Outcome Metric Id - (Value)outcomemetric12
Results 12: Result level - (Value)Outcome level
Results 12: Result type - (Value)Final
Results 12: Period - Start - (Value)2020-07
Results 12: Period - End - (Value)2024-09
Results 12: Outcomes achieved - (Value)1
Results 13: Outcome Metric Id - (Value)outcomemetric13
Results 13: Result level - (Value)Outcome level
Results 13: Result type - (Value)Final
Results 13: Period - Start - (Value)2020-07
Results 13: Period - End - (Value)2024-09
Outcome Payment Plans 1: Outcome Payment Plan Id - (Value)plan1
Outcome Payment Plans 1: Period - Start - (Value)2018-10
Outcome Payment Plans 1: Period - End - (Value)2021-12
Outcome Payment Plans 2: Outcome Payment Plan Id - (Value)plan2
Outcome Payment Plans 2: Period - Start - (Value)2021-12
Outcome Payment Plans 2: Period - End - (Value)2022-09
Outcome Payment Plans 3: Outcome Payment Plan Id - (Value)plan3
Outcome Payment Plans 3: Period - Start - (Value)2022-09
Outcome Payment Plans 3: Period - End - (Value)2023-10
Outcome Payment Plans 4: Outcome Payment Plan Id - (Value)plan4
Outcome Payment Plans 4: Period - Start - (Value)2023-10
Outcome Payment Plans 4: Period - End - (Value)current
Outcome Payment Plans 4: Notesno archive date found
Outcome Payments 1: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 1: Period - Start - (Value)2020-04
Outcome Payments 1: Period - End - (Value)2020-06
Outcome Payments 1: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 1: Type - (Value)Planned
Outcome Payments 1: Payments - Currency - (Value)GBP
Outcome Payments 2: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 2: Period - Start - (Value)2020-07
Outcome Payments 2: Period - End - (Value)2020-09
Outcome Payments 2: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 2: Type - (Value)Planned
Outcome Payments 2: Payments - Currency - (Value)GBP
Outcome Payments 2: Payments - Amount - (Value)59040
Outcome Payments 3: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 3: Period - Start - (Value)2020-10
Outcome Payments 3: Period - End - (Value)2020-12
Outcome Payments 3: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 3: Type - (Value)Planned
Outcome Payments 3: Payments - Currency - (Value)GBP
Outcome Payments 3: Payments - Amount - (Value)117240
Outcome Payments 4: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 4: Period - Start - (Value)2021-01
Outcome Payments 4: Period - End - (Value)2021-03
Outcome Payments 4: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 4: Type - (Value)Planned
Outcome Payments 4: Payments - Currency - (Value)GBP
Outcome Payments 4: Payments - Amount - (Value)285960
Outcome Payments 5: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 5: Period - Start - (Value)2021-04
Outcome Payments 5: Period - End - (Value)2021-06
Outcome Payments 5: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 5: Type - (Value)Planned
Outcome Payments 5: Payments - Currency - (Value)GBP
Outcome Payments 5: Payments - Amount - (Value)436970
Outcome Payments 6: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 6: Period - Start - (Value)2021-07
Outcome Payments 6: Period - End - (Value)2021-09
Outcome Payments 6: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 6: Type - (Value)Planned
Outcome Payments 6: Payments - Currency - (Value)GBP
Outcome Payments 6: Payments - Amount - (Value)538540
Outcome Payments 7: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 7: Period - Start - (Value)2021-10
Outcome Payments 7: Period - End - (Value)2021-12
Outcome Payments 7: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 7: Type - (Value)Planned
Outcome Payments 7: Payments - Currency - (Value)GBP
Outcome Payments 7: Payments - Amount - (Value)658620
Outcome Payments 8: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 8: Period - Start - (Value)2022-01
Outcome Payments 8: Period - End - (Value)2022-03
Outcome Payments 8: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 8: Type - (Value)Planned
Outcome Payments 8: Payments - Currency - (Value)GBP
Outcome Payments 8: Payments - Amount - (Value)779520
Outcome Payments 9: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 9: Period - Start - (Value)2022-04
Outcome Payments 9: Period - End - (Value)2022-06
Outcome Payments 9: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 9: Type - (Value)Planned
Outcome Payments 9: Payments - Currency - (Value)GBP
Outcome Payments 9: Payments - Amount - (Value)890581
Outcome Payments 10: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 10: Period - Start - (Value)2022-07
Outcome Payments 10: Period - End - (Value)2022-09
Outcome Payments 10: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 10: Type - (Value)Planned
Outcome Payments 10: Payments - Currency - (Value)GBP
Outcome Payments 10: Payments - Amount - (Value)962980
Outcome Payments 11: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 11: Period - Start - (Value)2022-10
Outcome Payments 11: Period - End - (Value)2022-12
Outcome Payments 11: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 11: Type - (Value)Planned
Outcome Payments 11: Payments - Currency - (Value)GBP
Outcome Payments 11: Payments - Amount - (Value)986880
Outcome Payments 12: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 12: Period - Start - (Value)2023-01
Outcome Payments 12: Period - End - (Value)2023-03
Outcome Payments 12: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 12: Type - (Value)Planned
Outcome Payments 12: Payments - Currency - (Value)GBP
Outcome Payments 12: Payments - Amount - (Value)961811
Outcome Payments 13: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 13: Period - Start - (Value)2023-04
Outcome Payments 13: Period - End - (Value)2023-06
Outcome Payments 13: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 13: Type - (Value)Planned
Outcome Payments 13: Payments - Currency - (Value)GBP
Outcome Payments 13: Payments - Amount - (Value)942011
Outcome Payments 14: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 14: Period - Start - (Value)2023-07
Outcome Payments 14: Period - End - (Value)2023-09
Outcome Payments 14: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 14: Type - (Value)Planned
Outcome Payments 14: Payments - Currency - (Value)GBP
Outcome Payments 14: Payments - Amount - (Value)951501
Outcome Payments 15: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 15: Period - Start - (Value)2023-10
Outcome Payments 15: Period - End - (Value)2023-12
Outcome Payments 15: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 15: Type - (Value)Planned
Outcome Payments 15: Payments - Currency - (Value)GBP
Outcome Payments 15: Payments - Amount - (Value)985940
Outcome Payments 16: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 16: Period - Start - (Value)2024-01
Outcome Payments 16: Period - End - (Value)2024-03
Outcome Payments 16: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 16: Type - (Value)Planned
Outcome Payments 16: Payments - Currency - (Value)GBP
Outcome Payments 16: Payments - Amount - (Value)956420
Outcome Payments 17: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 17: Period - Start - (Value)2024-04
Outcome Payments 17: Period - End - (Value)2024-06
Outcome Payments 17: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 17: Type - (Value)Planned
Outcome Payments 17: Payments - Currency - (Value)GBP
Outcome Payments 17: Payments - Amount - (Value)1001770
Outcome Payments 18: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 18: Period - Start - (Value)2024-07
Outcome Payments 18: Period - End - (Value)2024-09
Outcome Payments 18: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 18: Type - (Value)Planned
Outcome Payments 18: Payments - Currency - (Value)GBP
Outcome Payments 18: Payments - Amount - (Value)776480
Outcome Payments 19: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 19: Period - Start - (Value)2024-10
Outcome Payments 19: Period - End - (Value)2024-12
Outcome Payments 19: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 19: Type - (Value)Planned
Outcome Payments 19: Payments - Currency - (Value)GBP
Outcome Payments 19: Payments - Amount - (Value)660500
Outcome Payments 20: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 20: Period - Start - (Value)2025-01
Outcome Payments 20: Period - End - (Value)2025-03
Outcome Payments 20: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 20: Type - (Value)Planned
Outcome Payments 20: Payments - Currency - (Value)GBP
Outcome Payments 20: Payments - Amount - (Value)554830
Outcome Payments 21: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 21: Period - Start - (Value)2025-04
Outcome Payments 21: Period - End - (Value)2025-06
Outcome Payments 21: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 21: Type - (Value)Planned
Outcome Payments 21: Payments - Currency - (Value)GBP
Outcome Payments 21: Payments - Amount - (Value)433930
Outcome Payments 22: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 22: Period - Start - (Value)2025-07
Outcome Payments 22: Period - End - (Value)2025-09
Outcome Payments 22: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 22: Type - (Value)Planned
Outcome Payments 22: Payments - Currency - (Value)GBP
Outcome Payments 22: Payments - Amount - (Value)313030
Outcome Payments 23: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 23: Period - Start - (Value)2025-10
Outcome Payments 23: Period - End - (Value)2025-12
Outcome Payments 23: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 23: Type - (Value)Planned
Outcome Payments 23: Payments - Currency - (Value)GBP
Outcome Payments 23: Payments - Amount - (Value)187210
Outcome Payments 24: Outcome Payment Plan Id - (Value)plan1
Outcome Payments 24: Period - Start - (Value)2026-01
Outcome Payments 24: Period - End - (Value)2026-03
Outcome Payments 24: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 24: Type - (Value)Planned
Outcome Payments 24: Payments - Currency - (Value)GBP
Outcome Payments 25: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 25: Period - Start - (Value)2020-04
Outcome Payments 25: Period - End - (Value)2020-06
Outcome Payments 25: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 25: Type - (Value)Planned
Outcome Payments 25: Payments - Currency - (Value)GBP
Outcome Payments 26: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 26: Period - Start - (Value)2020-07
Outcome Payments 26: Period - End - (Value)2020-09
Outcome Payments 26: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 26: Type - (Value)Planned
Outcome Payments 26: Payments - Currency - (Value)GBP
Outcome Payments 26: Payments - Amount - (Value)15296
Outcome Payments 27: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 27: Period - Start - (Value)2020-10
Outcome Payments 27: Period - End - (Value)2020-12
Outcome Payments 27: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 27: Type - (Value)Planned
Outcome Payments 27: Payments - Currency - (Value)GBP
Outcome Payments 27: Payments - Amount - (Value)29086
Outcome Payments 28: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 28: Period - Start - (Value)2021-01
Outcome Payments 28: Period - End - (Value)2021-03
Outcome Payments 28: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 28: Type - (Value)Planned
Outcome Payments 28: Payments - Currency - (Value)GBP
Outcome Payments 28: Payments - Amount - (Value)67737
Outcome Payments 29: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 29: Period - Start - (Value)2021-04
Outcome Payments 29: Period - End - (Value)2021-06
Outcome Payments 29: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 29: Type - (Value)Planned
Outcome Payments 29: Payments - Currency - (Value)GBP
Outcome Payments 29: Payments - Amount - (Value)77236
Outcome Payments 30: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 30: Period - Start - (Value)2021-07
Outcome Payments 30: Period - End - (Value)2021-09
Outcome Payments 30: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 30: Type - (Value)Planned
Outcome Payments 30: Payments - Currency - (Value)GBP
Outcome Payments 30: Payments - Amount - (Value)63260
Outcome Payments 31: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 31: Period - Start - (Value)2021-10
Outcome Payments 31: Period - End - (Value)2021-12
Outcome Payments 31: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 31: Type - (Value)Planned
Outcome Payments 31: Payments - Currency - (Value)GBP
Outcome Payments 31: Payments - Amount - (Value)278943
Outcome Payments 32: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 32: Period - Start - (Value)2022-01
Outcome Payments 32: Period - End - (Value)2022-03
Outcome Payments 32: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 32: Type - (Value)Planned
Outcome Payments 32: Payments - Currency - (Value)GBP
Outcome Payments 32: Payments - Amount - (Value)278943
Outcome Payments 33: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 33: Period - Start - (Value)2022-04
Outcome Payments 33: Period - End - (Value)2022-06
Outcome Payments 33: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 33: Type - (Value)Planned
Outcome Payments 33: Payments - Currency - (Value)GBP
Outcome Payments 33: Payments - Amount - (Value)786111
Outcome Payments 34: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 34: Period - Start - (Value)2022-07
Outcome Payments 34: Period - End - (Value)2022-09
Outcome Payments 34: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 34: Type - (Value)Planned
Outcome Payments 34: Payments - Currency - (Value)GBP
Outcome Payments 34: Payments - Amount - (Value)786111
Outcome Payments 35: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 35: Period - Start - (Value)2022-10
Outcome Payments 35: Period - End - (Value)2022-12
Outcome Payments 35: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 35: Type - (Value)Planned
Outcome Payments 35: Payments - Currency - (Value)GBP
Outcome Payments 35: Payments - Amount - (Value)786111
Outcome Payments 36: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 36: Period - Start - (Value)2023-01
Outcome Payments 36: Period - End - (Value)2023-03
Outcome Payments 36: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 36: Type - (Value)Planned
Outcome Payments 36: Payments - Currency - (Value)GBP
Outcome Payments 36: Payments - Amount - (Value)786111
Outcome Payments 37: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 37: Period - Start - (Value)2023-04
Outcome Payments 37: Period - End - (Value)2023-06
Outcome Payments 37: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 37: Type - (Value)Planned
Outcome Payments 37: Payments - Currency - (Value)GBP
Outcome Payments 37: Payments - Amount - (Value)1343997
Outcome Payments 38: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 38: Period - Start - (Value)2023-07
Outcome Payments 38: Period - End - (Value)2023-09
Outcome Payments 38: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 38: Type - (Value)Planned
Outcome Payments 38: Payments - Currency - (Value)GBP
Outcome Payments 38: Payments - Amount - (Value)1369356
Outcome Payments 39: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 39: Period - Start - (Value)2023-10
Outcome Payments 39: Period - End - (Value)2023-12
Outcome Payments 39: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 39: Type - (Value)Planned
Outcome Payments 39: Payments - Currency - (Value)GBP
Outcome Payments 39: Payments - Amount - (Value)1369356
Outcome Payments 40: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 40: Period - Start - (Value)2024-01
Outcome Payments 40: Period - End - (Value)2024-03
Outcome Payments 40: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 40: Type - (Value)Planned
Outcome Payments 40: Payments - Currency - (Value)GBP
Outcome Payments 40: Payments - Amount - (Value)1369356
Outcome Payments 41: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 41: Period - Start - (Value)2024-04
Outcome Payments 41: Period - End - (Value)2024-06
Outcome Payments 41: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 41: Type - (Value)Planned
Outcome Payments 41: Payments - Currency - (Value)GBP
Outcome Payments 41: Payments - Amount - (Value)1724374
Outcome Payments 42: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 42: Period - Start - (Value)2024-07
Outcome Payments 42: Period - End - (Value)2024-09
Outcome Payments 42: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 42: Type - (Value)Planned
Outcome Payments 42: Payments - Currency - (Value)GBP
Outcome Payments 42: Payments - Amount - (Value)1724374
Outcome Payments 43: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 43: Period - Start - (Value)2024-10
Outcome Payments 43: Period - End - (Value)2024-12
Outcome Payments 43: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 43: Type - (Value)Planned
Outcome Payments 43: Payments - Currency - (Value)GBP
Outcome Payments 43: Payments - Amount - (Value)1828753
Outcome Payments 44: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 44: Period - Start - (Value)2025-01
Outcome Payments 44: Period - End - (Value)2025-03
Outcome Payments 44: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 44: Type - (Value)Planned
Outcome Payments 44: Payments - Currency - (Value)GBP
Outcome Payments 45: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 45: Period - Start - (Value)2025-04
Outcome Payments 45: Period - End - (Value)2025-06
Outcome Payments 45: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 45: Type - (Value)Planned
Outcome Payments 45: Payments - Currency - (Value)GBP
Outcome Payments 46: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 46: Period - Start - (Value)2025-07
Outcome Payments 46: Period - End - (Value)2025-09
Outcome Payments 46: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 46: Type - (Value)Planned
Outcome Payments 46: Payments - Currency - (Value)GBP
Outcome Payments 47: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 47: Period - Start - (Value)2025-10
Outcome Payments 47: Period - End - (Value)2025-12
Outcome Payments 47: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 47: Type - (Value)Planned
Outcome Payments 47: Payments - Currency - (Value)GBP
Outcome Payments 48: Outcome Payment Plan Id - (Value)plan2
Outcome Payments 48: Period - Start - (Value)2026-01
Outcome Payments 48: Period - End - (Value)2026-03
Outcome Payments 48: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 48: Type - (Value)Planned
Outcome Payments 48: Payments - Currency - (Value)GBP
Outcome Payments 49: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 49: Period - Start - (Value)2020-04
Outcome Payments 49: Period - End - (Value)2020-06
Outcome Payments 49: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 49: Type - (Value)Planned
Outcome Payments 49: Payments - Currency - (Value)GBP
Outcome Payments 50: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 50: Period - Start - (Value)2020-07
Outcome Payments 50: Period - End - (Value)2020-09
Outcome Payments 50: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 50: Type - (Value)Planned
Outcome Payments 50: Payments - Currency - (Value)GBP
Outcome Payments 51: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 51: Period - Start - (Value)2020-10
Outcome Payments 51: Period - End - (Value)2020-12
Outcome Payments 51: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 51: Type - (Value)Planned
Outcome Payments 51: Payments - Currency - (Value)GBP
Outcome Payments 51: Payments - Amount - (Value)37189
Outcome Payments 52: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 52: Period - Start - (Value)2021-01
Outcome Payments 52: Period - End - (Value)2021-03
Outcome Payments 52: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 52: Type - (Value)Planned
Outcome Payments 52: Payments - Currency - (Value)GBP
Outcome Payments 52: Payments - Amount - (Value)59046
Outcome Payments 53: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 53: Period - Start - (Value)2021-04
Outcome Payments 53: Period - End - (Value)2021-06
Outcome Payments 53: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 53: Type - (Value)Planned
Outcome Payments 53: Payments - Currency - (Value)GBP
Outcome Payments 53: Payments - Amount - (Value)77236
Outcome Payments 54: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 54: Period - Start - (Value)2021-07
Outcome Payments 54: Period - End - (Value)2021-09
Outcome Payments 54: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 54: Type - (Value)Planned
Outcome Payments 54: Payments - Currency - (Value)GBP
Outcome Payments 54: Payments - Amount - (Value)63260
Outcome Payments 55: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 55: Period - Start - (Value)2021-10
Outcome Payments 55: Period - End - (Value)2021-12
Outcome Payments 55: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 55: Type - (Value)Planned
Outcome Payments 55: Payments - Currency - (Value)GBP
Outcome Payments 55: Payments - Amount - (Value)81069
Outcome Payments 56: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 56: Period - Start - (Value)2022-01
Outcome Payments 56: Period - End - (Value)2022-03
Outcome Payments 56: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 56: Type - (Value)Planned
Outcome Payments 56: Payments - Currency - (Value)GBP
Outcome Payments 56: Payments - Amount - (Value)87521
Outcome Payments 57: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 57: Period - Start - (Value)2022-04
Outcome Payments 57: Period - End - (Value)2022-06
Outcome Payments 57: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 57: Type - (Value)Planned
Outcome Payments 57: Payments - Currency - (Value)GBP
Outcome Payments 57: Payments - Amount - (Value)60450
Outcome Payments 58: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 58: Period - Start - (Value)2022-07
Outcome Payments 58: Period - End - (Value)2022-09
Outcome Payments 58: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 58: Type - (Value)Planned
Outcome Payments 58: Payments - Currency - (Value)GBP
Outcome Payments 58: Payments - Amount - (Value)49790
Outcome Payments 59: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 59: Period - Start - (Value)2022-10
Outcome Payments 59: Period - End - (Value)2022-12
Outcome Payments 59: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 59: Type - (Value)Planned
Outcome Payments 59: Payments - Currency - (Value)GBP
Outcome Payments 59: Payments - Amount - (Value)132470
Outcome Payments 60: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 60: Period - Start - (Value)2023-01
Outcome Payments 60: Period - End - (Value)2023-03
Outcome Payments 60: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 60: Type - (Value)Planned
Outcome Payments 60: Payments - Currency - (Value)GBP
Outcome Payments 60: Payments - Amount - (Value)329450
Outcome Payments 61: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 61: Period - Start - (Value)2023-04
Outcome Payments 61: Period - End - (Value)2023-06
Outcome Payments 61: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 61: Type - (Value)Planned
Outcome Payments 61: Payments - Currency - (Value)GBP
Outcome Payments 61: Payments - Amount - (Value)687610
Outcome Payments 62: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 62: Period - Start - (Value)2023-07
Outcome Payments 62: Period - End - (Value)2023-09
Outcome Payments 62: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 62: Type - (Value)Planned
Outcome Payments 62: Payments - Currency - (Value)GBP
Outcome Payments 62: Payments - Amount - (Value)846790
Outcome Payments 63: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 63: Period - Start - (Value)2023-10
Outcome Payments 63: Period - End - (Value)2023-12
Outcome Payments 63: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 63: Type - (Value)Planned
Outcome Payments 63: Payments - Currency - (Value)GBP
Outcome Payments 63: Payments - Amount - (Value)1045440
Outcome Payments 64: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 64: Period - Start - (Value)2024-01
Outcome Payments 64: Period - End - (Value)2024-03
Outcome Payments 64: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 64: Type - (Value)Planned
Outcome Payments 64: Payments - Currency - (Value)GBP
Outcome Payments 64: Payments - Amount - (Value)1250250
Outcome Payments 65: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 65: Period - Start - (Value)2024-04
Outcome Payments 65: Period - End - (Value)2024-06
Outcome Payments 65: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 65: Type - (Value)Planned
Outcome Payments 65: Payments - Currency - (Value)GBP
Outcome Payments 65: Payments - Amount - (Value)1313040
Outcome Payments 66: Outcome Payment Plan Id - (Value)plan3
Outcome Payments 66: Period - Start - (Value)2024-07
Outcome Payments 66: Period - End - (Value)2024-09
Outcome Payments 66: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 66: Type - (Value)Planned
Outcome Payments 66: Payments - Currency - (Value)GBP
Outcome Payments 66: Payments - Amount - (Value)1266590
Outcome Payments 67: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 67: Period - Start - (Value)2020-04
Outcome Payments 67: Period - End - (Value)2020-06
Outcome Payments 67: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 67: Type - (Value)Planned
Outcome Payments 67: Payments - Currency - (Value)GBP
Outcome Payments 68: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 68: Period - Start - (Value)2020-07
Outcome Payments 68: Period - End - (Value)2020-09
Outcome Payments 68: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 68: Type - (Value)Planned
Outcome Payments 68: Payments - Currency - (Value)GBP
Outcome Payments 69: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 69: Period - Start - (Value)2020-10
Outcome Payments 69: Period - End - (Value)2020-12
Outcome Payments 69: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 69: Type - (Value)Planned
Outcome Payments 69: Payments - Currency - (Value)GBP
Outcome Payments 69: Payments - Amount - (Value)37189
Outcome Payments 70: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 70: Period - Start - (Value)2021-01
Outcome Payments 70: Period - End - (Value)2021-03
Outcome Payments 70: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 70: Type - (Value)Planned
Outcome Payments 70: Payments - Currency - (Value)GBP
Outcome Payments 70: Payments - Amount - (Value)59046
Outcome Payments 71: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 71: Period - Start - (Value)2021-04
Outcome Payments 71: Period - End - (Value)2021-06
Outcome Payments 71: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 71: Type - (Value)Planned
Outcome Payments 71: Payments - Currency - (Value)GBP
Outcome Payments 71: Payments - Amount - (Value)77236
Outcome Payments 72: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 72: Period - Start - (Value)2021-07
Outcome Payments 72: Period - End - (Value)2021-09
Outcome Payments 72: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 72: Type - (Value)Planned
Outcome Payments 72: Payments - Currency - (Value)GBP
Outcome Payments 72: Payments - Amount - (Value)63260
Outcome Payments 73: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 73: Period - Start - (Value)2021-10
Outcome Payments 73: Period - End - (Value)2021-12
Outcome Payments 73: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 73: Type - (Value)Planned
Outcome Payments 73: Payments - Currency - (Value)GBP
Outcome Payments 73: Payments - Amount - (Value)81069
Outcome Payments 74: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 74: Period - Start - (Value)2022-01
Outcome Payments 74: Period - End - (Value)2022-03
Outcome Payments 74: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 74: Type - (Value)Planned
Outcome Payments 74: Payments - Currency - (Value)GBP
Outcome Payments 74: Payments - Amount - (Value)87521
Outcome Payments 75: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 75: Period - Start - (Value)2022-04
Outcome Payments 75: Period - End - (Value)2022-06
Outcome Payments 75: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 75: Type - (Value)Planned
Outcome Payments 75: Payments - Currency - (Value)GBP
Outcome Payments 75: Payments - Amount - (Value)60450
Outcome Payments 76: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 76: Period - Start - (Value)2022-07
Outcome Payments 76: Period - End - (Value)2022-09
Outcome Payments 76: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 76: Type - (Value)Planned
Outcome Payments 76: Payments - Currency - (Value)GBP
Outcome Payments 76: Payments - Amount - (Value)53962
Outcome Payments 77: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 77: Period - Start - (Value)2022-10
Outcome Payments 77: Period - End - (Value)2022-12
Outcome Payments 77: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 77: Type - (Value)Planned
Outcome Payments 77: Payments - Currency - (Value)GBP
Outcome Payments 77: Payments - Amount - (Value)20015
Outcome Payments 78: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 78: Period - Start - (Value)2023-01
Outcome Payments 78: Period - End - (Value)2023-03
Outcome Payments 78: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 78: Type - (Value)Planned
Outcome Payments 78: Payments - Currency - (Value)GBP
Outcome Payments 78: Payments - Amount - (Value)129264
Outcome Payments 79: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 79: Period - Start - (Value)2023-04
Outcome Payments 79: Period - End - (Value)2023-06
Outcome Payments 79: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 79: Type - (Value)Planned
Outcome Payments 79: Payments - Currency - (Value)GBP
Outcome Payments 79: Payments - Amount - (Value)133140
Outcome Payments 80: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 80: Period - Start - (Value)2023-07
Outcome Payments 80: Period - End - (Value)2023-09
Outcome Payments 80: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 80: Type - (Value)Planned
Outcome Payments 80: Payments - Currency - (Value)GBP
Outcome Payments 80: Payments - Amount - (Value)116890
Outcome Payments 81: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 81: Period - Start - (Value)2023-10
Outcome Payments 81: Period - End - (Value)2023-12
Outcome Payments 81: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 81: Type - (Value)Planned
Outcome Payments 81: Payments - Currency - (Value)GBP
Outcome Payments 81: Payments - Amount - (Value)169930
Outcome Payments 82: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 82: Period - Start - (Value)2024-01
Outcome Payments 82: Period - End - (Value)2024-03
Outcome Payments 82: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 82: Type - (Value)Planned
Outcome Payments 82: Payments - Currency - (Value)GBP
Outcome Payments 82: Payments - Amount - (Value)248200
Outcome Payments 83: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 83: Period - Start - (Value)2024-04
Outcome Payments 83: Period - End - (Value)2024-06
Outcome Payments 83: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 83: Type - (Value)Planned
Outcome Payments 83: Payments - Currency - (Value)GBP
Outcome Payments 83: Payments - Amount - (Value)403680
Outcome Payments 84: Outcome Payment Plan Id - (Value)plan4
Outcome Payments 84: Period - Start - (Value)2024-07
Outcome Payments 84: Period - End - (Value)2024-09
Outcome Payments 84: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 84: Type - (Value)Planned
Outcome Payments 84: Payments - Currency - (Value)GBP
Outcome Payments 84: Payments - Amount - (Value)559160
Outcome Payments 85: Period - Start - (Value)2020-07
Outcome Payments 85: Period - End - (Value)2020-12
Outcome Payments 85: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 85: Type - (Value)Actual
Outcome Payments 85: Payments - Currency - (Value)GBP
Outcome Payments 85: Payments - Amount - (Value)37189
Outcome Payments 86: Period - Start - (Value)2021-01
Outcome Payments 86: Period - End - (Value)2021-03
Outcome Payments 86: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 86: Type - (Value)Actual
Outcome Payments 86: Payments - Currency - (Value)GBP
Outcome Payments 86: Payments - Amount - (Value)59046
Outcome Payments 87: Period - Start - (Value)2021-04
Outcome Payments 87: Period - End - (Value)2021-06
Outcome Payments 87: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 87: Type - (Value)Actual
Outcome Payments 87: Payments - Currency - (Value)GBP
Outcome Payments 87: Payments - Amount - (Value)77236
Outcome Payments 88: Period - Start - (Value)2021-07
Outcome Payments 88: Period - End - (Value)2021-09
Outcome Payments 88: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 88: Type - (Value)Actual
Outcome Payments 88: Payments - Currency - (Value)GBP
Outcome Payments 88: Payments - Amount - (Value)63260
Outcome Payments 89: Period - Start - (Value)2021-10
Outcome Payments 89: Period - End - (Value)2021-12
Outcome Payments 89: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 89: Type - (Value)Actual
Outcome Payments 89: Payments - Currency - (Value)GBP
Outcome Payments 89: Payments - Amount - (Value)81069
Outcome Payments 90: Period - Start - (Value)2022-01
Outcome Payments 90: Period - End - (Value)2022-03
Outcome Payments 90: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 90: Type - (Value)Actual
Outcome Payments 90: Payments - Currency - (Value)GBP
Outcome Payments 90: Payments - Amount - (Value)87521
Outcome Payments 91: Period - Start - (Value)2022-04
Outcome Payments 91: Period - End - (Value)2022-06
Outcome Payments 91: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 91: Type - (Value)Actual
Outcome Payments 91: Payments - Currency - (Value)GBP
Outcome Payments 91: Payments - Amount - (Value)60450
Outcome Payments 92: Period - Start - (Value)2022-07
Outcome Payments 92: Period - End - (Value)2022-09
Outcome Payments 92: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 92: Type - (Value)Actual
Outcome Payments 92: Payments - Currency - (Value)GBP
Outcome Payments 92: Payments - Amount - (Value)53962
Outcome Payments 93: Period - Start - (Value)2022-10
Outcome Payments 93: Period - End - (Value)2022-12
Outcome Payments 93: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 93: Type - (Value)Actual
Outcome Payments 93: Payments - Currency - (Value)GBP
Outcome Payments 93: Payments - Amount - (Value)20015
Outcome Payments 94: Period - Start - (Value)2023-01
Outcome Payments 94: Period - End - (Value)2023-03
Outcome Payments 94: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 94: Type - (Value)Actual
Outcome Payments 94: Payments - Currency - (Value)GBP
Outcome Payments 94: Payments - Amount - (Value)129251
Outcome Payments 95: Period - Start - (Value)2023-04
Outcome Payments 95: Period - End - (Value)2023-06
Outcome Payments 95: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 95: Type - (Value)Actual
Outcome Payments 95: Payments - Currency - (Value)GBP
Outcome Payments 95: Payments - Amount - (Value)132202
Outcome Payments 96: Period - Start - (Value)2023-07
Outcome Payments 96: Period - End - (Value)2023-09
Outcome Payments 96: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 96: Type - (Value)Actual
Outcome Payments 96: Payments - Currency - (Value)GBP
Outcome Payments 96: Payments - Amount - (Value)114250
Outcome Payments 97: Period - Start - (Value)2023-10
Outcome Payments 97: Period - End - (Value)2023-12
Outcome Payments 97: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 97: Type - (Value)Actual
Outcome Payments 97: Payments - Currency - (Value)GBP
Outcome Payments 97: Payments - Amount - (Value)61945
Outcome Payments 98: Period - Start - (Value)2024-01
Outcome Payments 98: Period - End - (Value)2024-03
Outcome Payments 98: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 98: Type - (Value)Actual
Outcome Payments 98: Payments - Currency - (Value)GBP
Outcome Payments 98: Payments - Amount - (Value)43221
Outcome Payments 99: Period - Start - (Value)2024-04
Outcome Payments 99: Period - End - (Value)2024-06
Outcome Payments 99: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 99: Type - (Value)Actual
Outcome Payments 99: Payments - Currency - (Value)GBP
Outcome Payments 99: Payments - Amount - (Value)22880
Outcome Payments 100: Period - Start - (Value)2024-07
Outcome Payments 100: Period - End - (Value)2024-09
Outcome Payments 100: Payer Organisation ID - (Value)INDIGO-ORG-0171, INDIGO-ORG-1157, INDIGO-ORG-0318, INDIGO-ORG-1158, INDIGO-ORG-0808, INDIGO-ORG-1159
Outcome Payments 100: Type - (Value)Actual
Outcome Payments 100: Payments - Currency - (Value)GBP
Outcome Payments 100: Payments - Amount - (Value)23027