Project

IDINDIGO-POJ-0141
Impact Bond Name - (Value)Links for Life
Stage of Development - (Value)Complete
Dates - Start date of service provision - (Value)2012-04
Dates - (Source ID's)source2
Overall project finance - Total investment commitment - Currency - (Value)GBP
Overall project finance - Total investment commitment - Amount - Exact - (Value)370000
Overall project finance - Total investment commitment - Amount USD - Exact - (Value)584474.7807
Overall project finance - Maximum potential outcome payment - Currency - (Value)GBP
Overall project finance - Maximum potential outcome payment - Amount - (Value)1300000
Overall project finance - Maximum potential outcome payment - Amount USD - (Value)2053560.04
Purpose and classifications - Intervention - (Value)The IF pilot projects aim to prevent young people from becoming NEET, or support those already NEET to re-engage with education, training and employment. Interventions display a wide diversity in terms of participant age range, in and out of school provision and the balance between one to one and group work. Some programmes are built around participation on a structured programme or course. Despite these differences, there are also commonalities between projects including: time spent on initial marketing, recruitment and engagement; an intense initial process of working with each participant to achieve a positive shift in ‘mind-set’; a more extended period of personal and skills development and the encouragement of mental resilience in dealing with challenges and difficulties faced; and an ongoing process of goal setting and progression facilitation. Five specially trained 'Link Workers' offer individual, continuous and holistic 1-to-1 support for young people in areas such as drug mental health, family intervention, housing/homelessness, youth offending, educational welfare, and drugs/alcohol misuse. Support is provided in school (e.g. sitting with young people in classes) as well as outside (e.g. home visits), alongside a range of complementary vocational training courses.
Purpose and classifications - Policy sector - (Value)Employment and training
Purpose and classifications - (Source ID's)source6,source2
Service and beneficiaries - Target population - (Value)14 - 19 year olds, including the most vulnerable young people and those falling through gaps in mainstream provision
Service and beneficiaries - Actual number of unique service users or beneficiaries engaged (total) - (Value)600
Service and beneficiaries - Unit type of actual service users or beneficiaries engaged - (Value)Individual
Service and beneficiaries - (Source ID's)source2
Notes - (Value)Referral Route: Referrals from schools, local NEET forum, Leaving Care Team, Mental Health Teams and youth providers. Also self-referrals. Additional assessments: Qualitative assessments of early implementation (2014) and delivery in the final year of operation (2016) were carried out to identify, for project partners, the key issues that the pilot projects have encountered in their first years, as well as assess how effectively the pilots have operated after three years of delivery. Furthermore, impact evaluation was carried out using survey and administrative participant data against a matched sample of non-participants to determine the Social Return on Investment (2018).
Outcome Funds 1: IdINDIGO-FUND-0002
Delivery Locations 1: Service Provision ID - (Value)deliverylocation1
Delivery Locations 1: Location - Name - (Value)Stratford/Newham, East London
Delivery Locations 1: Location - Country - (Value)GB
Delivery Locations 1: Lat/Lng - Lat - (Value)51.512249
Delivery Locations 1: Lat/Lng - Lng - (Value)0.039285
Sources 1: Idsource1
Sources 1: Name - (Value)Qualitative evaluation of the DWP Innovation Fund: Final report (DWP, 2016) Appendix B
Sources 2: Idsource2
Sources 2: Name - (Value)Qualitative evaluation of the DWP Innovation Fund: Final report (DWP, 2016)
Sources 3: Idsource3
Sources 3: Name - (Value)Community Links website: https://www.community-links.org
Sources 4: Idsource4
Sources 4: Name - (Value)https://sibdatabase.socialfinance.org.uk/?project_id=14
Sources 5: Idsource5
Sources 5: Name - (Value)Youth Unemployment Innovation Fund Pilot: Starts and Outcomes (DWP, 2015)
Sources 6: Idsource6
Sources 6: Name - (Value)Innovation Fund Pilots Qualitative Evaluation: Early implementation Findings (DWP, 2014) and https://sibdatabase.socialfinance.org.uk/?project_id=14
Sources 7: Idsource7
Sources 7: Name - (Value)Qualitative evaluation of the DWP Innovation Fund: Final report (DWP, 2016) Appendix A
Sources 8: Idsource8
Sources 8: Name - (Value)The Innovation Fund Invitation to Tender: Specification and Supporting Information (Annex 3)
Sources 9: Idsource9
Sources 9: Name - (Value)Innovation Fund Pilots Qualitative Evaluation: Early implementation Findings (DWP, 2014) - p.17; Qualitative evaluation of the DWP Innovation Fund: Final report (DWP, 2016) - p. 17; Evaluation of the Innovation Fund pilot: Quantitative Assessment of Impact and Social Return on Investment (09/2018) - p.14
Sources 10: Idsourcehackandlearn2021-08
Sources 10: Name - (Value)Hack and Learn - August 2021
Sources 11: Idsource11
Sources 11: Name - (Value)Email exchange with Bridges Fund Management on 2/2/2022.
Sources 12: Idsource12
Sources 12: Name - (Value)Qualitative evaluation of the DWP Innovation Fund: Final report
Sources 12: Type - (Value)Evaluation report
Sources 12: Publishing Organisations - (Value)Department for Work and Pensions (DWP)
Sources 12: URL - (Value)https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/535032/rr922-qualitative-evaluation-of-the-dwp-innovation-fund-final-report.pdf
Sources 13: Idsource13
Sources 13: Name - (Value)Quantitative assessment of impact and social return on investment (Evaluation of the Innovation Fund pilot)
Sources 13: Type - (Value)Evaluation report
Sources 13: Publishing Organisations - (Value)Department for Work and Pensions (DWP)
Sources 13: URL - (Value)https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/737021/evaluation-of-the-innovation-fund-pilot-quantitative-assessment-of-impact-and-social-return-on-investment.pdf
Service Provisions 1: Idserviceprovision1
Service Provisions 1: Organisation ID - (Value)INDIGO-ORG-0288
Outcome Payment Commitments 1: Organisation ID - (Value)INDIGO-ORG-0047
Outcome Payment Commitments 1: Organisation Role Category - (Value)Government/Public Sector/Public Bank
Outcome Payment Commitments 1: Maximum potential Outcome payment - Currency - (Value)GBP
Outcome Payment Commitments 1: Maximum potential Outcome payment - Amount - (Value)1300000
Investments 1: Idinvestment1
Investments 1: Organisation ID - (Value)INDIGO-ORG-0289
Investments 2: Idinvestment2
Investments 2: Organisation ID - (Value)INDIGO-ORG-1304
Investments 3: Idinvestment3
Investments 3: Organisation ID - (Value)INDIGO-ORG-1295
Investments 4: Idinvestment4
Investments 4: Organisation ID - (Value)INDIGO-ORG-0268
Investments 5: Idinvestment5
Investments 5: Organisation ID - (Value)INDIGO-ORG-1305
Intermediary services 1: Organisation ID - (Value)INDIGO-ORG-0121
Intermediary services 1: Organisation Role Category - (Value)Other
Intermediary services 1: Other Role Description - (Value)Fund Management
Outcome Metrics 1: Idoutcomemetric1
Outcome Metrics 1: Outcome Definition - (Value)Improved school behaviour. Poor behaviour at school can be defined as those “whose behaviour is unacceptable, who break school rules or who fail to follow a reasonable instruction (Section 91 of Education and Inspection Act 2006)”. Students who have a pattern of this behaviour have to decrease this significantly. The improvement has to be demonstrated for a minimum of 13 continuous weeks (not withstanding school holidays) to generate an outcome payment. Confirmation letter from school/teacher/home tutor.
Outcome Metrics 1: Targeted number of service users Or beneficiaries (total) - (Value)740
Outcome Metrics 1: Primary SDG goal - (Value)4
Outcome Metrics 1: Primary SDG target - (Value)4.1
Outcome Metrics 1: Secondary SDG targets - (Value)4.2
Outcome Metrics 2: Idoutcomemetric2
Outcome Metrics 2: Outcome Definition - (Value)Improved school attendance ‘Persistent truancy’ means deliberate absence for days or weeks at a time. This has to decrease to attendance levels associated with the average student. The improvement has to be demonstrated for a minimum of 13 continuous weeks (not withstanding school holidays) to generate an outcome payment. Confirmation letter from school/teacher/home tutor. Copy of Attendance Record
Outcome Metrics 2: Primary SDG goal - (Value)4
Outcome Metrics 2: Primary SDG target - (Value)4.1
Outcome Metrics 2: Secondary SDG targets - (Value)4.2
Outcome Metrics 3: Idoutcomemetric3
Outcome Metrics 3: Outcome Definition - (Value)First Level 1 NQF qualification At least one GCSE passes (or NQF Level 1): -BTEC Introductory diplomas and certificates -OCR Nationals Level 1 and 2 -Key skill level 1 -NVQ at level 1 -Skills for Life at Level 1 Confirmation from school or copy of certificate
Outcome Metrics 3: Primary SDG goal - (Value)4
Outcome Metrics 3: Primary SDG target - (Value)4.1
Outcome Metrics 4: Idoutcomemetric4
Outcome Metrics 4: Outcome Definition - (Value)First Level 2 NQF qualification Achievements in the following qualifications are counted as full Level 2: • 5 full GCSE/iGCSE at grade A* to C • 2 AS level (including VCE) at grade A to E • 1 A/A2 level (including VCE) at grade A to E • 1 NVQ/full VRQ* pass at Level 2 or higher • 1 International Baccalaureate pass (* more than 325 guided learning hours) Confirmation from school or copy of certificate
Outcome Metrics 4: Primary SDG goal - (Value)4
Outcome Metrics 4: Primary SDG target - (Value)4.1
Outcome Metrics 5: Idoutcomemetric5
Outcome Metrics 5: Outcome Definition - (Value)First Level 3 NQF qualification Achievements in the following qualifications are counted at Level 3 : • 4 AS level (including VCE) at grade A to E • 2 A/A2 level (including VCE) at grade A to E • 1 NVQ/full VRQ* pass at Level 3 or higher % • 1 International Baccalaureate pass % • 2 Pre-U Principal Subject or 4 Pre-U Short Course Subjects (* more than 595 guided learning hours) Copy of registration form/copy of certificate showing achievement and/or course completion
Outcome Metrics 5: Primary SDG goal - (Value)4
Outcome Metrics 5: Primary SDG target - (Value)4.3
Outcome Metrics 6: Idoutcomemetric6
Outcome Metrics 6: Outcome Definition - (Value)First Level 4 NQF qualification or above Entry into post-18 higher or further education, including university. The improvement has to be demonstrated for a minimum of 13 continuous weeks (not withstanding holidays) to generate an outcome payment. Copy of registration certificate and confirmation from university/college
Outcome Metrics 6: Primary SDG goal - (Value)4
Outcome Metrics 6: Primary SDG target - (Value)4.3
Outcome Metrics 7: Idoutcomemetric7
Outcome Metrics 7: Outcome Definition - (Value)English for speakers of other languages Completion of English as a Second Language Course with a minimum of a pass grade Copy of certificate
Outcome Metrics 7: Primary SDG goal - (Value)4
Outcome Metrics 8: Idoutcomemetric8
Outcome Metrics 8: Outcome Definition - (Value)Entry to first employment (13 weeks) Entry into employment of 16 hours or more. For under 18’s this includes a training element. A training element is defined as at least 280 guided learning hours per year. This needs to have lasted for a minimum of 13 continuous or cumulative weeks in order for it to generate an outcome payment. Self-employment is also included. • This period begins to accrue from and including the job start date. • A person must be in employment and off-benefit Self employment is a person who is gainfully employed 1) in Great Britain and 2) in employment that is not employed earners employment Confirmation letter from employer. Self-Employment job outcomes will need to be supported by a letter from a recognised business start up organisation which must include a business plan or evidence of trading that is clearly linked to the company and be proportionate to the business.
Outcome Metrics 8: Primary SDG goal - (Value)4
Outcome Metrics 8: Primary SDG target - (Value)4.4
Outcome Metrics 9: Idoutcomemetric9
Outcome Metrics 9: Outcome Definition - (Value)Entry to first employment (26 weeks) Sustained employment is where a customer has been in employment and off benefit for a total of 26 weeks: and specifically where •a Job Outcome payment has been paid; and •thirteen continuous weeks in employment have elapsed between the Job Outcome payment date Confirmation letter from employer. Self-Employment job outcomes will need to be supported by a letter from a recognised business start up organisation which must include a business plan or evidence of trading that is clearly linked to the company and be proportionate to the business.
Outcome Metrics 9: Primary SDG goal - (Value)4
Outcome Metrics 9: Primary SDG target - (Value)4.4
Outcome Pricings 1: Outcome Metric Id - (Value)outcomemetric1
Outcome Pricings 1: Currency - (Value)GBP
Outcome Pricings 1: Price Per Unit - Amount - (Value)1300
Outcome Pricings 1: Price Per Unit - Amount USD - (Value)949
Outcome Pricings 1: Maximum Price if all targets achieved - Amount - (Value)11700
Outcome Pricings 1: NotesThe maximum amount payable per individual is 8,200 for the first round of Innovation Fund projects, and 11,700 GBP for the second round (the maximum possible) of Innovation Fund Projects.
Outcome Pricings 2: Outcome Metric Id - (Value)outcomemetric2
Outcome Pricings 2: Currency - (Value)GBP
Outcome Pricings 2: Price Per Unit - Amount - (Value)800
Outcome Pricings 2: Price Per Unit - Amount USD - (Value)584
Outcome Pricings 2: Maximum Price if all targets achieved - Amount - (Value)11700
Outcome Pricings 2: NotesThe maximum amount payable per individual is 8,200 for the first round of Innovation Fund projects, and 11,700 GBP for the second round (the maximum possible) of Innovation Fund Projects.
Outcome Pricings 3: Outcome Metric Id - (Value)outcomemetric3
Outcome Pricings 3: Currency - (Value)GBP
Outcome Pricings 3: Price Per Unit - Amount - (Value)700
Outcome Pricings 3: Price Per Unit - Amount USD - (Value)511
Outcome Pricings 3: Maximum Price if all targets achieved - Amount - (Value)11700
Outcome Pricings 3: NotesThe maximum amount payable per individual is 8,200 for the first round of Innovation Fund projects, and 11,700 GBP for the second round (the maximum possible) of Innovation Fund Projects.
Outcome Pricings 4: Outcome Metric Id - (Value)outcomemetric4
Outcome Pricings 4: Currency - (Value)GBP
Outcome Pricings 4: Price Per Unit - Amount - (Value)2200
Outcome Pricings 4: Price Per Unit - Amount USD - (Value)1606
Outcome Pricings 4: Maximum Price if all targets achieved - Amount - (Value)11700
Outcome Pricings 4: NotesThe maximum amount payable per individual is 8,200 for the first round of Innovation Fund projects, and 11,700 GBP for the second round (the maximum possible) of Innovation Fund Projects.
Outcome Pricings 5: Outcome Metric Id - (Value)outcomemetric5
Outcome Pricings 5: Currency - (Value)GBP
Outcome Pricings 5: Price Per Unit - Amount - (Value)3300
Outcome Pricings 5: Price Per Unit - Amount USD - (Value)2409
Outcome Pricings 5: Maximum Price if all targets achieved - Amount - (Value)11700
Outcome Pricings 5: NotesThe maximum amount payable per individual is 8,200 for the first round of Innovation Fund projects, and 11,700 GBP for the second round (the maximum possible) of Innovation Fund Projects.
Outcome Pricings 6: Outcome Metric Id - (Value)outcomemetric6
Outcome Pricings 6: Currency - (Value)GBP
Outcome Pricings 6: Price Per Unit - Amount - (Value)2000
Outcome Pricings 6: Price Per Unit - Amount USD - (Value)1460
Outcome Pricings 6: Maximum Price if all targets achieved - Amount - (Value)11700
Outcome Pricings 6: NotesThe maximum amount payable per individual is 8,200 for the first round of Innovation Fund projects, and 11,700 GBP for the second round (the maximum possible) of Innovation Fund Projects.
Outcome Pricings 7: Outcome Metric Id - (Value)outcomemetric7
Outcome Pricings 7: Currency - (Value)GBP
Outcome Pricings 7: Price Per Unit - Amount - (Value)1200
Outcome Pricings 7: Price Per Unit - Amount USD - (Value)876
Outcome Pricings 7: Maximum Price if all targets achieved - Amount - (Value)11700
Outcome Pricings 7: NotesThe maximum amount payable per individual is 8,200 for the first round of Innovation Fund projects, and 11,700 GBP for the second round (the maximum possible) of Innovation Fund Projects.
Outcome Pricings 8: Outcome Metric Id - (Value)outcomemetric8
Outcome Pricings 8: Currency - (Value)GBP
Outcome Pricings 8: Price Per Unit - Amount - (Value)2600
Outcome Pricings 8: Price Per Unit - Amount USD - (Value)1898
Outcome Pricings 8: Maximum Price if all targets achieved - Amount - (Value)11700
Outcome Pricings 8: NotesThe maximum amount payable per individual is 8,200 for the first round of Innovation Fund projects, and 11,700 GBP for the second round (the maximum possible) of Innovation Fund Projects.
Outcome Pricings 9: Outcome Metric Id - (Value)outcomemetric9
Outcome Pricings 9: Currency - (Value)GBP
Outcome Pricings 9: Price Per Unit - Amount - (Value)1000
Outcome Pricings 9: Price Per Unit - Amount USD - (Value)730
Outcome Pricings 9: Maximum Price if all targets achieved - Amount - (Value)11700
Outcome Pricings 9: NotesThe maximum amount payable per individual is 8,200 for the first round of Innovation Fund projects, and 11,700 GBP for the second round (the maximum possible) of Innovation Fund Projects.
Results 1: Result level - (Value)Project level
Results 1: Result type - (Value)Final
Results 1: Period - Start - (Value)2012-04
Results 1: Period - End - (Value)2015-04
Results 1: Outcomes achieved - (Value)According to the Qualitative Evaluation of the Innovation Fund projects, projects considered themselves to have broadly succeeded in what they originally set out to do, in terms of meeting, or exceeding, outcomes targets, remaining financially viable and repaying investments. There was also a strongly expressed conviction that positive social impact was being achieved with young people; a conviction supported by the testimony of young people themselves.
Results 1: Evaluation Documents - (Value)source12
Results 1: NotesAll the Innovation Fund projects were evaluated as one pilot project. The data on the Quantitative and Qualitative evaluation reports is not at the project level, but the group level (the whole pilot).
Results 2: Result level - (Value)Project level
Results 2: Result type - (Value)Final
Results 2: Period - Start - (Value)2012-04
Results 2: Period - End - (Value)2015-04
Results 2: Outcomes achieved - (Value)According to the Quantitative Evaluation of the Innovation Fund projects, the IF pilot has produced positive effects on participants, allowing them to achieve low-level qualifcations. However, it seems likely that the programme did not support young people in attaining higher-level qualifcations as expected, possibly refecting delivery challenges faced by projects in supporting individuals with disadvantaged backgrounds.
Results 2: Evaluation Documents - (Value)source13
Results 2: NotesAll the Innovation Fund projects were evaluated as one pilot project. The data on the Quantitative and Qualitative evaluation reports is not at the project level, but the group level (the whole pilot).
Documents 1: Title - (Value)Evaluation of the Innovation Fund pilot: Quantitative assessment of impact and social return on investment
Documents 1: URL - (Value)https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/737021/evaluation-of-the-innovation-fund-pilot-quantitative-assessment-of-impact-and-social-return-on-investment.pdf
Documents 2: Title - (Value)Evaluation of the Innovation Fund pilot: Qualitative evaluation of the DWP Innovation Fund
Documents 2: URL - (Value)https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/535032/rr922-qualitative-evaluation-of-the-dwp-innovation-fund-final-report.pdf

Download Form